Two-current IP method predicts water bearing structure in front of the tunnel, based on the effect of water bearing structure upon induced polarization.
二电流激发极化法是根据含水构造对激发极化效应的影响来预测隧道前方的含水构造的。
In the production process of Huopu Mine, advance mining method was temporarily adopted in local area due to the impact of underground water and geologic structure in front of the working face.
火铺矿采煤工作面生产过程中,由于工作面前方受水及地质构造等因素的影响而局部地段临时采用前进式推进的方法进行回采。
In the production process of Huopu Mine, advance mining method was temporarily adopted in local area due to the impact of underground water and geologic structure in front of the working face.
火铺矿采煤工作面生产过程中,由于工作面前方受水及地质构造等因素的影响而局部地段临时采用前进式推进的方法进行回采。
应用推荐