Some improved techniques of the loom are introduced, and the electronic let-off system is developed, which consists of three parts: driven motor, controller and warp tension testing.
文章介绍了织机送经机构的改造技术,讨论了电子送经系统的动力、控制、张力探测部分的设计准则和选用方法。
This testing system is focused on the development and application of dynamic measuring system of warp tension based on computer.
介绍了经纱张力等工艺参数动态数据测试系统的开发及应用研究。
This testing system is focused on the development and application of dynamic measuring system of warp tension based on computer.
介绍了经纱张力等工艺参数动态数据测试系统的开发及应用研究。
应用推荐