The position where the detonator is requires to make shock wave front reaching at the wall of container-shaped structure at one time so that it is well-proportioned by force;
药包布置位置要尽可能使冲击波波阵面同一时刻达到容器状构筑物侧壁,使容器状构筑物受力均匀为原则;
Workers use a 10cm to 20 cm catheter made of metal or rubber to pierce through abdominal wall into the gallbladder, making the bile streaming through the catheter into the container.
用一根长10cm~20cm不等的金属或橡胶质地导管穿过腹壁直插胆囊。
The storage container (2) has an inner connecting element (7) for connection to an outer connecting element (8) by the latter's penetration of the container wall at the inner connecting element.
贮存容器(2)有一个内在的连接件(7)连接在内部连接到一个外部连接的元素元素后者的容器壁渗透(8)。
Along with the large-oriented of container vessels, quay wall elevation has been becoming higher and higher, and working load increases continually.
随着集装箱船舶的大型化,码头岸壁高度越来越大,而且使用荷载也不断增加。
The bottle mouth for a liquid container can completely avoid liquid losses when the liquid flows to the outer wall of the container and pollution for the surrounding environment.
本实用新型能完全避免因液体流到容器外壁所造成的液体的流失和对周围环境的污染。
Automatic control technology for the parison wall-thickness of plastics blow-extrusion container is one of the key technology for the quality of the product.
在中空塑料容器的挤出吹塑成形工艺中,型坯壁厚控制技术是关系产品质量的关键技术之一。
In the closed state of the container, a gap is formed between the other sides (13) of the first wall (12, 13) and the other sides (23) of the second wall (22, 23).
在容器的闭合状态下,在第一隔板(12,13)的另一侧面(13)和第二隔板(22,23)的第二侧面(23)之间形成有缝隙。
The utility model relates to a collecting cleaning and storing device for water, including: (1). A water container opened on the top, the container wall of which is waterproof. (2).
本实用新型涉及水收集净化储存装置,该装置包括:1)上面开 口的储水容器,该容器壁为防水结构;
This paper deals with the prevention and treatment of cracks in wharf crest wall surface combining the engineering practice of container terminal and bulk grain terminal in Rizhao Port.
结合日照港集装箱、散粮码头工程实际,介绍码头胸墙面层裂缝的预防及处理。
This paper deals with the prevention and treatment of cracks in wharf crest wall surface combining the engineering practice of container terminal and bulk grain terminal in Rizhao Po...
结合日照港集装箱、散粮码头工程实际,介绍码头胸墙面层裂缝的预防及处理。
The results of this study indicate that liquid reorientate along the container wall and the reorientation time measured is consistent with theoretical estimation.
试验结果表明,液体重定位呈壁流流型。实测重定位时间与理论估算值一致。
Through a number of shaking table tests, the aseismic behavior of rigid pile composite foundation and the effect of the flexible wall container were investigated.
通过大量激振试验,对刚性桩复合地基的地震反应性态、柔性容器的效果等问题进行了研究。
By the calculated result, the charts correlating the dimensionless groups such as the entire solidification period, the average heat flux at the container wall, the thermal properties of the...
根据所得结果,给出了可供设计相变储热器用的总的凝固时间与壁面平均热流、相变材料的物性及边界条件之间的关系式。
By the calculated result, the charts correlating the dimensionless groups such as the entire solidification period, the average heat flux at the container wall, the thermal properties of the...
根据所得结果,给出了可供设计相变储热器用的总的凝固时间与壁面平均热流、相变材料的物性及边界条件之间的关系式。
应用推荐