• The void water pressure of the 2nd tailings dam in Dexing Copper Mining is measured by the system of multi parameter synthetical test, and the saturation line is inferred from void water pressure.

    利用岩土工程参数综合观测系统德兴铜矿尾矿孔隙压力进行观测,通过孔隙水压力反推出浸润线

    youdao

  • Through analysis and fatigue test research to the super - void - water pressure, there is a new cognition that is the failure form and the influence in life of pavement structure by void - water.

    通过孔隙水压分析疲劳试验研究,探讨了空隙路面结构破坏形式和疲劳寿命影响

    youdao

  • Through analysis and fatigue test research to the super - void - water pressure, there is a new cognition that is the failure form and the influence in life of pavement structure by void - water.

    通过孔隙水压分析疲劳试验研究,探讨了空隙路面结构破坏形式和疲劳寿命影响

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定