• According to geologic characteristics, the vacuum preloading with prefabricated vertical drain (PVD) method was adopted to treat the soft soil in the intertidal zone.

    针对潮间带的地质特点,采取真空预压法联合塑料排水板加固处理潮间带软土地基。

    youdao

  • According to geologic characteristics, the vacuum preloading with prefabricated vertical drain (PVD) method was adopted to treat the soft soil in the intertidal zone.

    针对潮间带的地质特点,采取真空预压法联合塑料排水板加固处理潮间带软土地基。

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定