• According to geologic characteristics, the vacuum preloading with prefabricated vertical drain (PVD) method was adopted to treat the soft soil in the intertidal zone.

    针对潮间带的地质特点,采取真空预压法联合塑料排水板加固处理潮间带软土地基。

    youdao

  • The field disturbance during construction, such as the installing of vertical drain, was distinct from the sample disturbance.

    这种施工过程中土体受到的原位施工扰动有别于现场取土、应力释放等引起的试样扰动;

    youdao

  • Based on the above, the relationship between the disturbance area and the plastic area during the vertical drain construction is discussed, combined with project cases.

    在理论分析塑性区范围的基础上,结合工程实例探讨了竖井施工扰动区与塑性区之间的关系。

    youdao

  • The influences of spinning speed, bonding area and roller pressure on the permeability performance of PET spun-bonded prefabricated vertical drain filters were tested and analyzed.

    测试和分析了纺丝速度、轧点面积和轧辊压力对纺粘热轧滤膜透水率的影响。

    youdao

  • The influences of spinning speed, bonding area and roller pressure on the permeability performance of PET spun-bonded prefabricated vertical drain filters were tested and analyzed.

    测试和分析了纺丝速度、轧点面积和轧辊压力对纺粘热轧滤膜透水率的影响。

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定