Typically, the team USES planning poker to allocate story points to each story and then compare these to the team's velocity in order to plan the project.
通常,团队用规划扑克来为每个故事分配故事点,然后为了进行项目规划把它们与团队速度进行比较。
Will his average velocity help us to make correct iteration plan?
他的平均开发速率能够帮助我们制定准确的迭代计划吗?
This is also why you cannot rely on velocity to plan far ahead: there is no such thing as a typical project or even a typical iteration.
这也是为什么你不能依靠生产率去做长远的计划:没有典型的项目,乃至没有典型的迭代。
After that, take velocity of each point on the plan, multiply by half reflection time on time plan obtaining depth map.
之后,把速度平面上各点的速度乘以时间平面图上反射时间的一半,得出深度平面图。
It is shown that the climbing control plan is applicable to the aircraft with slower climbing according to optimum performance trajectory and automatically fly with optimum cruising velocity.
经分析计算与试飞结果表明,对于爬升较缓慢的飞机,本控制方案可实现沿优化性能轨迹上升,并自动转入有利速度巡航。
Explained with emphasis USES the BPTS series frequency changer to the engine bed main axle velocity modulation plan transformation, finally has produced the engine bed movement performance condition.
重点说明了利用BPTS系列变频器对机床主轴的调速方案改造,最后给出了机床运行的性能状况。
We have selected some surveying places along the railway line and surveyed over one thousand velocity data of trains in motion. Besides, According to the plan of running trains is used.
在铁路沿线选择几个测点,实际测量了一千多个列车运行速度的数据,并根据铁路列车运行图计算统计了各测点的运行速度。
Based on available research results the author probes into the numerical modeling of velocity field of upstream and downstream flow of project with asymmetric plan layout of gate and plant.
在现有研究成果的基础上,对闸站平面不对称布置枢纽上下游水流流场的数值模拟方法进行了探讨。
Based on available research results the author probes into the numerical modeling of velocity field of upstream and downstream flow of project with asymmetric plan layout of gate and plant.
在现有研究成果的基础上,对闸站平面不对称布置枢纽上下游水流流场的数值模拟方法进行了探讨。
应用推荐