The results show that formulation method of Sweden's vector diagram in the Hydrogenerator CAD is effective, simple and easy.
结果表明,公式化的瑞典矢量图法在水轮发电机的计算机辅助设计中,是一种简易可行、有效的方法。
The methods of Time-Domain Analysis consist of eye diagram, vector diagram, constellation diagram, correlation, synchronization, etc.
数字信号的时域分析有眼图、矢量图、星座图、相关性、同步等途径。
The method to selecting the wave vector diagram, the designing consideration and experimental results of the device are presented in the paper.
本文介绍这种器件波矢图的选择,设计方法和实验情况。
The voltage vector diagram is a very useful method that can make a qualitative analysis of the steady values of power system in normal and fault conditions.
定性地分析电力系统正常运行状态和故障后的稳态量时,电压相量图法是十分有用的工具。
According to the analysis of ac vector diagram, the effect of the mutual inductance among the traction windings on the control (performance) of the 4qc is discussed.
通过四象限变流器交流侧矢量图的分析,阐述牵引绕组间的互感对四象限变流器控制性能的影响。
By employing the vector diagram technology to vectorize the fissures photos, the geometric characters of fissures are extracted, before calculating the fissures ratios.
并利用矢量图技术对裂隙照片进行裂隙度计算。
Constellation diagram and contiguous vector diagram are audiovisual methods in multivariate statistics, they may be used for the cluster analysis of multivariate sample or index.
星座图与连接向量图是多变量统计的直观方法,可用于多变量样本或多变量指标的聚类分析。
In this paper the principle of a 3-phase voltage-typed PWM rectifying circuit is analyzed and both the vector diagram of rectifying circuit and a series of formula are also offered.
本文分析了三相电压型PWM整流电路的工作原理,给出了整流电路的相量图和一系列公式。
Based in practical application of Dispatching Automation System, the application of SVG (Scable Vector Graphics) technology in geographical wiring diagram is introduced.
以调度自动化系统为实际应用背景,提出将SVG(可缩放矢量图形)技术运用到地理接线图上。
Fig. 1. Diagram of plant expression vector.
图1。植物表达载体结构示意图。
After predigesting working procedure analytic diagram, designer creates the vector graph and marks off priority area.
它先由工序分析表简化后,再生成有向网络图,进而确定出优先权区域。
After predigesting working procedure analytic diagram, designer creates the vector graph and marks off priority area.
它先由工序分析表简化后,再生成有向网络图,进而确定出优先权区域。
应用推荐