• Taking care of validation phase probably belongs to the second context.

    一般第二种情况中才需要认真处理验证阶段

    youdao

  • Listing 2 shows you how to handle the validation phase (with some code omitted for clarity).

    清单2显示了如何处理验证阶段(为了保持简洁,省略了一些代码)。

    youdao

  • In contrast to the validation phase, the measurement phase must happen in bottom-up fashion.

    验证阶段相反度量阶段是自下而上的。

    youdao

  • During the validation phase, several configuration checks are performed. Some of the checks include.

    检验阶段,会执行几项配置检查

    youdao

  • Otherwise, when it detects colluded attacks, it goes into the secure validation phase to further process.

    检测出合谋攻击后,启动安全验证合谋攻击进行处理。

    youdao

  • The processing life cycle of an Ajax request that auto-saves form data must be stopped after the Validation phase.

    一个自动保存表单数据Ajax请求处理生命周期必须验证阶段过后终止

    youdao

  • The validation phase covered in Listing 2 and Listing 3 represents one of the three fundamental pillars of the Flex rendering engine.

    清单2清单3讨论验证阶段展示了Flex呈现引擎3基础支柱之一

    youdao

  • It is also a widely ignored phase, and it's possible you will see many advanced components written that never touch on the validation phase.

    也是容易被忽视阶段,有许多高级组件甚至没有验证阶段。

    youdao

  • The results of the requirements analysis will be the primary input for data warehouse modeling, after they have passed the requirements validation phase.

    需求分析结果通过需求验证阶段之后成为数据仓库建模主要输入

    youdao

  • Assume someone changed the font of the label, that you stored the new font and the related flag, and now you want LayoutManager to invoke the validation phase again.

    假设某人更改了标签字体,然后存储新的字体相关标记现在需要让Layout Manager再次调用验证阶段

    youdao

  • As explained in Part 1, the form data must be saved after the JSF validation phase, when all values of the JSF components have been converted and validated by the JSF framework.

    正如第1部分介绍表单数据必须JS f验证阶段,即JS f组件所有已经jsf框架转变验证之后才保存

    youdao

  • Because validation occurs before the component values are bound to the model (in the update model values phase), the model is in an unknown state.

    由于验证发生组件绑定模型之前(在更新模型值阶段),所以模型处于未知状态

    youdao

  • This stabilization phase proceeds until each validation component is able to provide correct feedback about message validation to its invoking component.

    这个稳定化阶段会一直持续,直到每个验证组件能够调用组件的消息验证做出正确回馈

    youdao

  • In the sections that follow, I'll walk you through every phase of the JSF request processing lifecycle, including event handling and validation.

    接下来的几节中,我们jsf请求处理生命周期每个步骤包括事件处理和验证。

    youdao

  • As you saw in Figure 1, conversion occurs in the apply request values phase and validation in the process validations phase.

    正如1转换发生应用请求阶段验证发生在处理验证阶段。

    youdao

  • The result of the validation of a model can have a few consequences over the analysis phase.

    模型确认结果分析阶段产生一定的影响。

    youdao

  • If the value conversion fails, an error message is generated and queued in the FacesContext, where it will be displayed during the render response phase, along with any validation errors.

    如果转换失败了,那么会生成一个错误消息FacesContext进行排队,在产生响应阶段显示其中的消息,同时还会显示所有验证错误。

    youdao

  • If the immediate property is false, the conversion and validation are performed during the following phase of the JSF request processing life cycle.

    如果immediate属性false,那么这个转换验证就会JSF请求处理生命周期一阶段执行

    youdao

  • Were the attribute set to true, conversion and validation would occur earlier in the lifecycle, during the apply request values phase (see Figure 3).

    如果这个属性设置true那么转换验证发生生命周期更早时期应用请求阶段(参见图3)。

    youdao

  • It makes sense, then, that conversion and validation processes happen before component data is bound to your backing bean model in the update model data lifecycle phase.

    因此,在更新模型数据生命周期阶段中,组件数据绑定backingbean模型之前进行转换验证处理是有道理的。

    youdao

  • Take part in the design review during equipment fabrication phase and assist the on-site validation and installation of extrusion equipment.

    设备制作阶段外国设备供应商一同进行设计评估协助设备的现场验证安装

    youdao

  • During subsequent project phases, further validation and development of the project scope for that phase is performed.

    随后项目阶段要进一步审核细化本阶段项目范围

    youdao

  • The validation parameters addressed andthe extent of the validation may vary, depending on the phase of developmentor the intended use for the data.

    验证参数处理和验证程度有所不同,这取决于开发阶段数据使用目的

    youdao

  • At the end of this phase (i. e., after a full year of testing), the validation is considered completed.

    阶段结束时(检测以后),就认为验证已经完成了

    youdao

  • This method not only used to the software system testing, but also suits the testing and validation of software requirements and design patterns in software design phase.

    这种方法不仅适合于软件系统测试同时适用于软件设计阶段软件需求设计模型测试和验证

    youdao

  • Phase unwrapping results of X SAR data have shown the validation of the analysis.

    实际x -SAR数据相位展开处理结果验证了本文分析和结论。

    youdao

  • Four step phase-shift method program and least squares phase solution package, have validation, this method is good.

    说明:程序最小二乘法相位包裹程序已经验证方法比较不错。

    youdao

  • Bombardier Aerospace has confirmed that final results of a three-phase wind tunnel test program provided further validation of the CSeries aircraft's aerodynamic design.

    庞巴迪宣布确认,三个阶段风洞测试最终结果表明C系列的气动设计是有效合理的。

    youdao

  • Methods With amount of galangin as index, wavelength, chromatographic system and system suitability, mobile phase, linear range, preparation of sample and analytic method validation were investigated.

    方法高良姜素含量指标,考察了液相色谱法测定的波长、色谱条件、流动线性范围样品制备方法中药质量标准分析方法验证试验。

    youdao

  • Methods With amount of galangin as index, wavelength, chromatographic system and system suitability, mobile phase, linear range, preparation of sample and analytic method validation were investigated.

    方法高良姜素含量指标,考察了液相色谱法测定的波长、色谱条件、流动线性范围样品制备方法中药质量标准分析方法验证试验。

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定