• The UUT model was proposed based on the thought of integrating test and diagnosis.

    提出基于测试诊断相结合思想UUT模型

    youdao

  • Switch system is the center of automatic testing platform, by which signal can be switched to the port of UUT and the apparatus.

    开关系统整个自动测试平台中心能够各类信号自动切换测对象输入端口相应的测试仪器

    youdao

  • Then, the signal-oriented UUT test requirements are matched through getting the logical resource and signal capability information of instrument.

    在此基础上,通过获取仪器资源逻辑资源相应信号能力信息匹配面向信号的UUT测试需求,实现了对仪器资源的自动配置。

    youdao

  • The basic characteristics and software architecture of the TPS design platform are discussed, and functions of the control Models related with ATS and UUT are introduced.

    讨论了测试程序软件设计平台基本功能、组成软件结构介绍了测试系统和UUT有关的各控制模型或数据库功能。

    youdao

  • The relation model of failure modes and characters of the unit under test (UUT) is created. The general adequacy criterion for the sample set is proposed according to the relation model.

    建立故障模式被测单元(UUT)特性之间关系模型根据关系模型建立样本通用充分性准则

    youdao

  • Circuit Breakers are supplied to protect the 115 VAC Inputs (2 each) as well as the Variable Amplitude Low Voltage Powers used by the Indicator Under Test (UUT) for Power, Reference or Lighting.

    断路器提供用于保护115VAC输入(2个),以及保护指示器(UUT)所用于电源基准照明可变振幅低压电源。

    youdao

  • Circuit Breakers are supplied to protect the 115 VAC Inputs (2 each) as well as the Variable Amplitude Low Voltage Powers used by the Indicator Under Test (UUT) for Power, Reference or Lighting.

    断路器提供用于保护115VAC输入(2个),以及保护指示器(UUT)所用于电源基准照明可变振幅低压电源。

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定