• Annual utilization hours will not be less than 6500 hours in the first year after half a year of starting up and commissioning. Later on annual mean operation hours is 7900 hours.

    锅炉投产调试运行半年第一利用小时低于6500小时,以后平均运行小时7900小时。

    youdao

  • Review the utilization patterns for the previous 24 hours, the previous week, and the previous month.

    应该观察24小时、前一周前一个月使用量模式

    youdao

  • Consider an example, where amepat is run on a workload's peak utilization time for 3 hours to plan ame.

    考虑一个示例其中amepat工作负载利用率处于峰值期间运行3个小时规划ame。

    youdao

  • Joint utilization of strip foundation under wall with static press pile is a kind of design and construction plan which can reduce man-hours and building costs.

    条形基础静压桩基结合使用,对于弱地基上多层混合结构建筑缩短工期,又能降低造价的设计、施工方案

    youdao

  • Appropriately distribute the staff and work schedule within team to improve the utilization ratio of working hours and working efficiency.

    合理调配人员班次提高工时利用率工作效率

    youdao

  • An optimization model is established for medium-term thermal power boot, which takes the equal hours of capacity utilization as the objective for all thermal power plants in a certain period.

    指定时间段内参与计算电站装机利用小时数相等目标建立中期火电开机优化模型

    youdao

  • An optimization model is established for medium-term thermal power boot, which takes the equal hours of capacity utilization as the objective for all thermal power plants in a certain period.

    指定时间段内参与计算电站装机利用小时数相等目标建立中期火电开机优化模型