• By mid-2006, construction of the main wall was completed and a reservoir more than 2 miles (3 kilometers) across had filled just upstream of the dam.

    2006年中期建设完成,水库超过2英里(3公里),跨越充满正义上游的大坝。

    youdao

  • The technique of extruded concrete side wall is a new method for construction of upstream face slab of CFRD, which was first used during construction of the Ita dam in Brazil.

    挤压混凝土边墙技术混凝土面板堆石坝上游施工方法

    youdao

  • On this basis, the curve shapes and the formulas of upstream crest and downstream crest and those under the breast wall of the spillway dam are presented.

    以此为依据,提出有胸墙溢流坝的堰顶上、下游璃底缘曲线型式相应的计算公式。

    youdao

  • The investigation of the upstream-downstream intermittent reversing flow in the near wall of a 2-D channel is attempted with a 2-D laser doppler velocimeter (LDV).

    本文应用二维激光多普勒测速仪LDV),二元通道间歇性特征做了尝试性测量。

    youdao

  • The investigation of the upstream-downstream intermittent reversing flow in the near wall of a 2-D channel is attempted with a 2-D laser doppler velocimeter (LDV).

    本文应用二维激光多普勒测速仪LDV),二元通道间歇性特征做了尝试性测量。

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定