James Bogardus (1800-1874) built the pioneering Cast Iron Building, New York (1848), with a rigid iron frame providing the main support for upper-floor and roof loads.
摩天大楼的先驱是博加德斯(1800~1874)在纽约市建造的铸铁大厦(1848),以牢固的铁骨架主要承载上层和屋顶的负荷。
Aimed at complex geology condition and requirements of big and concentive loading structure on upper part for foundation, drilled cast piles foundation is selected through comprehensive analysis.
针对复杂的地质条件和上部大而集中的荷载结构对基础的要求,通过综合技术分析,选用了挖孔灌注桩基础。
Laser-welded keeper just could be used when there was enough space between the upper jaw and the lower jaw in patients with limited space to design the cast-keepers.
激光焊接式衔铁适用于颌间距离较为充裕的患者,当颌间距离较小时则可选择铸造式衔铁。
Each rotor impeller is composed of a cast iron frame, a graphite casing, an upper main shaft, a lower main shaft, the graphite impeller and the belt wheel.
转子叶轮由铸铁支架、石墨套管,上部主轴、下部主轴、石墨叶轮和皮带轮构成。
Light well combines with automatic irrigation plant box on the roof together bring light and cast shadow over upper floor, also depict lush screen for the child's bedroom.
阳光透过屋顶上的自动灌溉植物箱的植株,在二楼撒上一片交织的光影,为儿童房增色不少。
The bow-shaped frame slab cast (2) is formed by integrally casting a bow-shaped frame upper arm (21), a bow-shaped frame lower arm (22) and a bow-shaped frame lateral slab (28).
弓架平板铸件(2)由弓架上臂(21)、弓架下臂(22)和弓架侧平板(28)铸 造成一体件。
The bow-shaped frame slab cast (2) is formed by integrally casting a bow-shaped frame upper arm (21), a bow-shaped frame lower arm (22) and a bow-shaped frame lateral slab (28).
弓架平板铸件(2)由弓架上臂(21)、弓架下臂(22)和弓架侧平板(28)铸 造成一体件。
应用推荐