• Extra safety requirements could mean added expense in an industry where the up-front costs of building a nuclear power plant are already very high.

    额外安全需求可能意味着额外成本投入,这样建设座核电站花费将会非常

    youdao

  • The quake and tsunami cut the supply of off-site power to the plant and diesel generators intended to provide back-up electricity to the cooling system.

    这次强烈地震海啸毁坏电厂外部电源以柴油为动力的后备电源。这些电源是用于和电站紧急情况下冷却系统提供电力供应的电源。

    youdao

  • The plan had been to transport up to 100, 000 tonnes of carbon dioxide from the power plant each year and inject it into depleted gas reservoirs at a giant gasfield near the Polish border.

    “黑泵”原本计划打算每年发电厂捕获10万二氧化碳它们靠近波兰边境废弃气田中。

    youdao

  • To keep up with user demand and because of the space and power demands of traditional tower and rack-mount servers, data centers are being forced to expand their physical plant at an alarming rate.

    为了紧跟用户需求,也因为传统桌上型机架型伺服器空间功率需求资料中心必须惊人的速度扩大物理设备的容量。

    youdao

  • Fact: Up to the present, the coal fired power plant accounts for the power source of 52% in the USA.

    事实截止目前美国有52%供电源自于燃煤电厂

    youdao

  • The situation of retrofitting 300mw large-scale power plant for dark start-up has been presented.

    介绍了300 MW机组锅炉起动改造与实施情况

    youdao

  • It analyzes the problem of phosphate treatment for boiler water in niangziguan power plant, bring up suggestion, in order to reduce the corrosion and scaling of water wall tube.

    娘子关发电厂磷酸盐处理存在问题进行分析降低锅炉水冷壁腐蚀结垢提出建设性意见

    youdao

  • According to rock soil engineering properties and dynamic character of the ash dam of Anyang Power Plant, the dynamic analytical model is set up by the finite element method.

    根据安阳电厂岩土工程性质及其动力学特性建立了适合灰坝工程动力分析模型并采用有限元法进行了动力分析。

    youdao

  • The design features for OTSC boiler start-up system of Mitsui Babcock and start-up system selected for Yangzhou Power Plant project OTSC boiler and its operating mode are introduced.

    介绍了英国三井巴布科克公司超临界机组带泵启动系统设计特点扬州第二发电厂超临界机组启动系统的选择系统的运行方式

    youdao

  • Considered from different perspectives the influence of friction factors of each part of combined power plant, set up the mathematical model of s.

    不同角度出发考虑联合动力装置系统部件摩擦力因素影响建立了三s离合器啮合过程的数学模型

    youdao

  • How to improve the construction quality of air cooled platform, speed up the air cooled platform construction schedule, will become the important research topic of power plant construction company.

    如何施工提高平台施工质量加快空冷平台施工进度成为电建施工单位一个重要研究课题

    youdao

  • The feed pipe was always chocked up at the cobble coal bunkers of two pulverizers in Guangdong Jinwan power plant before long its putting into production.

    投产不久时间内,广东金湾发电厂台炉磨煤机石子进料经常发生堵管,通过对石子煤斗进行改造,加强冲渣,消除了堵管问题。

    youdao

  • The boiler MFT (master fuel trip) protection was actuated during start up of feed water pump A of Unit 1 and 2 in Huaneng Shantou Power Plant.

    华能汕头发电厂1号2机组发生启动水泵锅炉燃料跳闸MFT事故。

    youdao

  • Starting from the analysis on the components and discharge amount of the sewages from the power plant, this paper sums up the emphasis of environmental influence evaluation of the power plant.

    电厂各类污水成分排放量分析入手,总结电厂环境影响评价重点

    youdao

  • By analyzing the characteristics of fuel consumption and start-up cost of thermal power plant, describes the calculation for the various kinds cost of thermal power plant.

    通过分析火电机组燃料耗量特性机组启停特性,介绍了机组组合问题各种成本计算方法

    youdao

  • All of the reactors at the Fukushima plant are now hooked up to power cables that should fuel cooling systems thus reducing the impact of a near-term radiation leak.

    岛核电站所有反应堆现在电力供应连接成功,冷却系统供电,从而降低近期核幅射泄漏的影响

    youdao

  • The situation of working condition: the pressure drop up to 160-350 kg, and power plant systems are under the greatest pressure valves, flow rate is generally 30% of normal flow.

    工况情况160- 350公斤电站系统中承受压差最大阀门流量一般正常流量30%。

    youdao

  • The phenomena of condenser vacuum slowly running down occurred many times in Yinchuan Congeneration Power Plant. The system tightness is up to standard.

    介绍了银川热电厂二期工程投运一年以后,多次出现真空缓慢下降现象

    youdao

  • In the paper, a combined prediction model is set up by use of the parametric optimization method with optimum weight. The model is used to study the vertical displacement of a power plant.

    采用最优加权配合参数优化建立组合预测模型,对某电站厂房机组平台作垂直位移分析

    youdao

  • In Production process of large scale power plant, coal fly ash is produced in large amounts. These coal fly ash is piled up. It pollute the environment, wasting the cultivated land.

    大型火力发电厂生产运行过程产生大量粉煤灰长期积存堆放,污染环境占用土地。

    youdao

  • The earth and rock excavation of the plant area of the 3rd heavy water reactor project of Qinshan nuclear power plant was of two hill-bodies linked up with Qinshan hill and Huaxiang Co.

    秦山三期重水工程厂区土石方开挖秦山相连山体,湘公司承担该项工程任务。

    youdao

  • Steal ball mill is the most familiar equipment in coal-fired power plant. It's take up of 80%-85% in countrywide coal-fired plant, and it is used widely in other industries.

    钢球磨煤机我国火电厂制粉系统使用最多的磨煤设备,约占全国电厂磨煤机总数的80% - 85%,广泛应用于其他行业。

    youdao

  • The design and functional configuration of the boiler start-up system of the 600 MW supercritical units in Chaozhou Sanbaimen Power Plant are described in detail.

    锅炉启动系统超临界机组关键技术之一,其汽机旁路系统是保证机组安全、经济启停、低负荷运行及妥善进行事故处理的重要手段。

    youdao

  • The design and functional configuration of the boiler start-up system of the 600 MW supercritical units in Chaozhou Sanbaimen Power Plant are described in detail.

    锅炉启动系统超临界机组关键技术之一,其汽机旁路系统是保证机组安全、经济启停、低负荷运行及妥善进行事故处理的重要手段。

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定