• The unloading deformation modulus can be expressed as the tangent modulus at any time; and it can be obtained through the test results.

    任一时间卸荷变形量仍表示切线模量,通过试验成果推导得出

    youdao

  • In the calculation of soil heave, the deformation modulus is obtained by taking the unloading path as the basic stress path and the effect of dewatering is not taken into account.

    目前对于深基坑回弹量计算,都是以基坑开挖卸荷基本应力路径获取变形量,并未考虑降水影响

    youdao

  • In the calculation of soil heave, the deformation modulus is obtained by taking the unloading path as the basic stress path and the effect of dewatering is not taken into account.

    目前对于深基坑回弹量计算,都是以基坑开挖卸荷基本应力路径获取变形量,并未考虑降水影响

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定