• Gongxu model works as a frame in the construction system of the underground structure group, and then the Gongxu model nodes in this frame are refined to Huodong model.

    地下厂房洞室施工系统工序模型作为框架,将框架中的模拟工序节点细化活动模型。

    youdao

  • According to the system models talked above, the system simulation software for the construction of underground structure group is developed using the object-oriented technology.

    针对上述系统模型,应用面向对象开发方法编制了地下厂房洞室施工系统仿真软件,适用于地下厂房洞室群施工仿真。

    youdao

  • The traffic transportation system of underground structure group is a kind of typical discrete event dynamic system, which is difficult to describe with analytic mathematic models.

    地下洞室交通运输系统典型离散事件动态系统,难以解析方法计算的数学模型描述

    youdao

  • The underground pit wall structure unstability or foundation pit excavations accident will cause multi -pile(group- pile) serious movements when high- rise building built on soft ground.

    土地基上建造的高层建筑,有时因地下围护结构基坑挖土方法的不当造成基础发生严重位移的工程事故

    youdao

  • The underground pit wall structure unstability or foundation pit excavations accident will cause multi -pile(group- pile) serious movements when high- rise building built on soft ground.

    土地基上建造的高层建筑,有时因地下围护结构基坑挖土方法的不当造成基础发生严重位移的工程事故

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定