• The paper introduces the treating construction technique of Micangkou tunnel underground buried river and cave at Three Gorges Dam alongside highway.

    本文介绍三峡库区沿江公路米仓口隧道地下暗河溶洞处理施工技术

    youdao

  • Under the condition of directly hit with precision-guided munitions, the research on the spall-resistant dam- age for underground structures has become important in protective engineering.

    钢板地下结构进行抗震塌破坏加固改造,成为精确打击条件坑道防护工程研究重要内容之一。

    youdao

  • The shale deformation of a given dam is the main issue of the study on underground openings and high slope, so it is important to discuss the viscoelastical constitutive model of the shale.

    某水电站泥板变形坝区地下洞室群高边坡研究主要问题探讨泥板岩粘弹性本构模型重要意义。

    youdao

  • The whole section explosion method which is the one for underground construction digging, suitable for stable and strong dam, form a section for one time by drilling explosion.

    断面适用于围岩坚固稳定,采用钻孔爆破方法将洞室开挖断面一次性开挖成型地下建筑工程洞室开挖掘进方法。

    youdao

  • Seepage free surface issue exists in analysis of the seepage concerning geotechnical slope, earth dam, underground cave and groundwater movement.

    岩土边坡土坝地下洞室地下水运动渗流分析,均存在有渗流自由问题

    youdao

  • Rock structure is one of main factors influencing stability problem of dam foundation, dam shoulder, underground structures and slope engineering.

    在大型水电工程岩体结构控制坝基地下结构边坡工程等稳定主要因素之一。

    youdao

  • It can be used in the foundation of the big dam, the foundation of the house, the prevent from of foundation and underground building of the road and bridge seeps.

    方法可利用坝基房基道路桥梁基础以及地下建筑防渗处理。

    youdao

  • The construction scheme and technique, used in the anti-seepage treatment of Bayi reservoir dam, are introduced, with a method of dealing with special underground structure inside the dam.

    坝基内部原有输水洞这一特殊地下构筑物采用了多设备组合施工方法

    youdao

  • At last, computing tectonic stress of dam zone and the relaxed-tension rock mass influence on the engineering (mostly influence on stability of underground cavern) using three-dimensional FEM.

    最后利用三维有限元计算坝址区的构造应力以及部分卸荷拉裂夹泥岩体工程(主要地下洞室稳定性)影响

    youdao

  • The dam cutoff wall is one of the underground hidden projects. Due to the construction technique and quality control, the quality detection is restricted by a variety of factors.

    大坝截渗属于地下隐蔽工程由于施工工艺质量控制等原因,质量检测多种因素制约。

    youdao

  • The plan to repair and reinforce the underground inclined channel of a uranium tailings dam and the application of PCC material in the project are introduced in detail.

    较详细介绍了尾矿库排水维修加固方案PCC材料工程中的应用。

    youdao

  • The plan to repair and reinforce the underground inclined channel of a uranium tailings dam and the application of PCC material in the project are introduced in detail.

    较详细介绍了尾矿库排水维修加固方案PCC材料工程中的应用。

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定