The deviation between ultra short term-load forecast and the original generation plan is unavoidable.
超短期负荷预测结果与原有的发电计划之间难免出现偏差。
The paper studied Ultra-short term the load forecasting from two aspects:data preprocessing and forecast method.
本文主要从训练样本选择和预测算法两个方面进行了研究。
The paper studied Ultra-short term the load forecasting from two aspects:data preprocessing and forecast method.
本文主要从训练样本选择和预测算法两个方面进行了研究。
应用推荐