• The UHVDC power transmission project from Yunnan to Guangdong is embedded into ac system, so the Yunnan power grid at the sending end will face with challenges.

    云南-广东特高压直流嵌入交流系统运行,将使云南电网面临诸多挑战

    youdao

  • The UHVDC power transmission project from Yunnan to Guangdong is embedded into ac system, so the Yunnan power grid at the sending end will face with challenges.

    云南-广东特高压直流嵌入交流系统运行,将使云南电网面临诸多挑战

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定