CDPR-BAF process is the two-sludge system on the combination of the biofilm and activated sludge.
CDPR-BAF工艺是生物膜和活性污泥法相结合的双污泥系统。
The affecting factors of the continuous-flow two-sludge system for simultaneous biological phosphorus and nitrogen removal were investigated in order to decide on the best working state of the system.
目的为了深入研究连续流双污泥反硝化同时除磷系统的主要影响因素,确定系统最佳运行条件。
Ihese two issues can be solved simultaneously by bioaugment, that is sewage sludge water is used to enrichment the nitrifier, and then added to the sewage treatment system.
针对这两个问题,本文利用污水厂的污泥水富集硝化菌,然后添加到污水处理系统,探讨生物添加对污水处理系统硝化性能与生物群落结构及数量的影响。
Ihese two issues can be solved simultaneously by bioaugment, that is sewage sludge water is used to enrichment the nitrifier, and then added to the sewage treatment system.
针对这两个问题,本文利用污水厂的污泥水富集硝化菌,然后添加到污水处理系统,探讨生物添加对污水处理系统硝化性能与生物群落结构及数量的影响。
应用推荐