To the problems of dynamic programming stereo matching algorithm modified by ground control points (GCPs), a pyramid two-level dynamic programming stereo matching algorithm is proposed.
针对控制点修正的动态规划立体匹配算法存在控制点求取时间长、实时性差的问题,提出一种金字塔双层动态规划立体匹配算法。
To the problems of dynamic programming stereo matching algorithm modified by ground control points (GCPs), a pyramid two-level dynamic programming stereo matching algorithm is proposed.
针对控制点修正的动态规划立体匹配算法存在控制点求取时间长、实时性差的问题,提出一种金字塔双层动态规划立体匹配算法。
应用推荐