• A - number of Suggestions are made on the tunnel design and construction in Shanghai soft soil ground.

    最后,对上海隧道设计施工提出了几点积极建议

    youdao

  • The paper discusses the calculation method of normal external water pressure in tunnel design, gives the example.

    本文隧道设计常用外水压力计算方法进行了探讨并给出算例

    youdao

  • Also, the optimizing the tunnel design and the construction are according as the result of surveying of the tunnel contour.

    同时隧道断面测量结果还是优化隧道设计施工的重要依据

    youdao

  • It is of great use to tunnel design and construction by investigation of karst development and analysis of water burst mechanism.

    调查岩溶发育特征,分析突水机理隧道设计施工具有重要的指导作用。

    youdao

  • There are disparities between the standard drawing used in home and abroad after surveying and studying the actuality of the tunnel design.

    通过调研国内外隧道设计现状发现,我国隧道设计采用标准图国外相比存在差距。

    youdao

  • Then the engineering geology and hydrologic geology conditions along the tunnel were made clear and it provided reliable parameters for tunnel design .

    查清了隧道通过区的工程地质水文地质条件隧道设计提供了稳定可靠技术参数

    youdao

  • The article expounds and summarizes some experience and lesson achieved in the process of multi-arch tunnel design and construction in Zhejiang Province.

    介绍总结了近年来浙江省隧道修建过程中的施工方法、防排水设计等方面的一些经验教训

    youdao

  • The calculating results are taken as the theoretic basis for the tunnel design and construction, as well as the reference for the design of similar structures.

    计算结果隧道设计施工提供理论依据可为其它同类结构设计提供参考

    youdao

  • According to the support result of bolting with wire support and resin anchor used in heading along goaf provide a reference for the tunnel design and support.

    根据锚索支护独特支护效果,再配合树脂锚杆沿巷道支护中的运用所达到效果,今后矿井巷道设计支护提供一定的参考。

    youdao

  • In the second chapter, we use the heat supply tunnel design of Beijing as the research background. We choose the "load-structure" mechanical model as the calculation model.

    第二北京热力隧道研究背景,确立以“荷载—结构”力学模型作为北京热力隧道衬砌计算模型。

    youdao

  • Any harmful disturbance in the tunnel design, the process of construction or use, all would lead to defects in the tunnel waterproofing and drainage system, causing the tunnel seepage.

    隧道设计施工使用过程任何有害扰动都会造成隧道排水体系缺陷从而引起隧道渗水

    youdao

  • The paper describes the design method and results of this tunnel, and presents several problems in high ground stress region to which the attention must be paid specially in big tunnel design.

    本文介绍隧洞设计方法设计成果提出了位于地应力区的大型隧洞设计特别重视几个问题

    youdao

  • The research results have important denotation not only for the dynamic stability evaluation of tunnel structures for speeded railway but also for the tunnel design and construction of railway.

    研究成果具有重要外延不仅减少铁路隧道结构动态稳定性评价同时也为隧道设计施工的铁路。

    youdao

  • Based on the railway and highway bridge and tunnel design standards, the loading calculations of the soil filled on the top of culvert are introduced and compared, and the more reasonable calc...

    本文铁路公路桥涵设计规范有关荷载计算了介绍对比,并提出相应合理计算方法。

    youdao

  • The application range of tunnel design norm is discussed and compared with the method of site monitoring or back analysis; meanwhile, the reasonable design and construction projects are suggested.

    讨论隧道设计规范适用范围实测反演方法进行比较,同时提出了合理设计施工方案。

    youdao

  • Hashash explains that the immersed-tube design requires largeportions of the tunnel to be built on a dry dock that is floated outinto the water and sunk.

    哈沙什解释说,沉管式设计要求大部分的隧道建筑上,干坞漂浮并沉没水里。

    youdao

  • The research results will provide references to tunnel waterproofing and drainage system design in high water pressure and water-enriched regions including subsea regions.

    研究成果类似水压水区以及海底隧道排水设计具有一定的参考价值借鉴作用。

    youdao

  • The calculate method and its results would provide theory gist of tunnel fire fighting design, the establishment of the escape direction system and the emergency scheme.

    方法结论特长隧道消防系统设计紧急疏散方案和引导指挥体系建立提供理论依据

    youdao

  • This offers us a theoretical basis for design of tunnel fire system and establishment of emergency evacuation program and command system.

    方法结论可特长隧道消防系统设计紧急疏散方案和引导指挥体系建立提供理论依据。

    youdao

  • Research results: the suggestion was proposed the dynamic design of tunnel mainly with engineering experience was adaptively applied in construction of large tunnel in priority.

    研究结果提出了长大隧道宜优先考虑采用工程经验为主隧道动态设计的原则建议

    youdao

  • The design features concrete canopy structures on both sides of the tunnel - creating a large enough surface area to realise sports fields on the roof of the tunnel section.

    设计特点隧道两侧混凝土雨棚结构——创建足够表面积实现隧道部分屋顶运动场

    youdao

  • He married an English girl and found himself with a great reputation, being employed to design and build the first tunnel under the Thames.

    娶了英国姑娘受聘设计建造泰晤士河第一条隧道名声大震。

    youdao

  • Through the introduction of the design option of Tangjia Bridge Road (S) under-railway tunnel the paper points out the importance of drainage and consolidation design of tunnels in coastal area.

    通过介绍汤家桥下穿铁路地道设计方案,指出沿海地区地道排水加固设计的重要性

    youdao

  • The results provide the references for design and construction of tunnel.

    结论隧道设计施工提供重要参考

    youdao

  • The results provide the references for design and construction of tunnel.

    结论隧道设计施工提供重要参考

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定