The truncated mooring line is designed to replace full-depth mooring line and use in truncated water depth model test.
水深截断系泊缆替代全水深系泊缆,用于截断水深模型试验。
In the wave model test of deepwater platform, the deepwater mooring system will be truncated not only vertically, but also probably horizontally.
在深水海洋平台的波浪水池模型试验中,深水系泊系统不仅需要被垂向截断,还可能被水平截断。
In the wave model test of deepwater platform, the deepwater mooring system will be truncated not only vertically, but also probably horizontally.
在深水海洋平台的波浪水池模型试验中,深水系泊系统不仅需要被垂向截断,还可能被水平截断。
应用推荐