The problems in commissioning of matching equipment for TRT device are presented. The solutions and Suggestions are put forward.
介绍了配套TRT装置调试运行中出现的问题、解决办法并提出了建议。
The technique and control system of the Top Pressure Recovery Turbine Unit (TRT) system are introduced.
介绍了高炉炉顶余压透平发电装置(T RT)的工艺流程和控制系统配置。
Now there are two forms of disposal for TRT device at Baosteel. They are same in parameter for technical design, but different in design output power and actual output power.
宝钢现有两种配置形式的TRT装置,其工艺设计参数相同,但设计输出功率不同,实际输出功率也不同。
Now there are two forms of disposal for TRT device at Baosteel. They are same in parameter for technical design, but different in design output power and actual output power.
宝钢现有两种配置形式的TRT装置,其工艺设计参数相同,但设计输出功率不同,实际输出功率也不同。
应用推荐