The most important part of converter transformer insulation is the valve side outlet device, which consists of bushing and surrounding barrier system.
换流变压器绝缘最关键的部位是由套管及纸板围屏系统组成的阀侧出线装置。
The judgment of transformer insulation condition, which is based on preventive test and DGA, has played an important role of accident prevention for a long time.
长期以来,根据预防性试验和油中溶解气体的气相色谱分析结果判断变压器的绝缘状况,对防止事故的发生起到了很大作用。
The structure and function of the field testing and diagnostic system of the large transformer insulation condition are introduced. The diagnostic techniques for transformers are presented.
介绍了一个大型变压器绝缘状态可现场测试诊断系统的结构和功能,以及应用该系统对变压器进行诊断的技术与手段。
The feature of optical fiber, the principle of optical fiber sensor and the application of optical fiber technique in power transformer insulation monitoring is also introduced in this paper.
本文阐述了光纤的特性和光纤传感器的原理及特性,介绍了光纤技术在电力变压器绝缘监测中的具体应用。
Transformer insulation sheath for general fixed on the elevatedseat flange, elevated seat inside about can put down the maintenance andmeasurement using the built-in type current transformer.
变压器绝缘护套一般固定在升高座的法兰上,升高座的里边大约可以放下维护和测量用的内装式电流互感器。
Transformer insulation sheath for general fixed on the elevatedseat flange, elevated seat inside about can put down the maintenance andmeasurement using the built-in type current transformer.
变压器绝缘护套一般固定在升高座的法兰上,升高座的里边大约可以放下维护和测量用的内装式电流互感器。
应用推荐