• This paper presents the construction and drive system designs and operating load torque calculation for a caterpillar trailer fixed on table with VVVF s drive system.

    介绍了新型台式变频履带牵引机结构设计工作负载转矩计算及拖动系统设计

    youdao

  • It takes about 30 minutes to load the bike on the trailer and pack the gear followed by an hour 's drive.

    自行车装载运输收拾装备大约需要30分钟然后是小时的车程

    youdao

  • This paper presents the construction and drive system designs and operating load torque calculation for a caterpillar trailer fixed on table with VVVF's drive system.

    介绍了新型台式变频履带牵引机结构设计工作负载转矩计算及拖动系统设计

    youdao

  • This paper presents the construction and drive system designs and operating load torque calculation for a caterpillar trailer fixed on table with VVVF's drive system.

    介绍了新型台式变频履带牵引机结构设计工作负载转矩计算及拖动系统设计

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定