The recommended location (as shown) is to connect the water regulator to the hydrant, and then run the hose to the trailer rig.
建议的安装位置(如图所示)是将水调节阀连接到消防栓上,然后再通过软管连接到拖车上。
The Trailer Mounted Rig HXY-800QT was developed to meet the requirement of exploitation of Sandstone Uranium Mine.
为了满足可地浸砂岩铀矿的开采工艺要求,研制了HXY- 800 Q T型拖车钻机。
The Trailer Mounted Rig HXY-800QT was developed to meet the requirement of exploitation of Sandstone Uranium Mine.
为了满足可地浸砂岩铀矿的开采工艺要求,研制了HXY- 800 Q T型拖车钻机。
应用推荐