• Shandong tower crane rental company recommended the tower crane foundation shall have no foundation displacement, collapse phenomenon.

    山东塔吊租赁公司建议塔机基础不得位移地基不得有塌方现象。

    youdao

  • A tower crane foundation basement project should take measures in particular: such as piling in foundation, and pile reinforcement and foundation anchor bolts end firmly welded together.

    地下室工程塔吊基础还要采取特别处理措施基础下打桩将桩端的钢筋基础地脚螺栓牢固焊接在一起

    youdao

  • The construction unit when the tower crane foundation, must ensure that the endurance meets the design requirements, the strength of reinforced concrete at least the design value of 80%.

    施工单位在做塔吊基础时候一定要确保耐力符合设计要求钢筋混凝土强度至少达到设计值的80%。

    youdao

  • Independent type of tower crane foundation relatively high investment cost, the utility model has the advantages of small occupied area, select the tower location flexible, good safety and stability.

    独立式塔吊基础相对投入费用优点占地小、选择立塔位置灵活安全稳定性

    youdao

  • To walk after fixed tower crane should remain on track, such as fixed position in backfill soil, the foundation for special treatment, must meet the load requirements.

    先行固定塔吊立于轨道上后固定位置处于回填土上时,基础特殊处理必须满足承载要求。

    youdao

  • Should not be less than the requirements of the tower base map technology in endurance value of bearing capacity of foundation of tower crane, tower crane rental company recommends 1.

    塔吊租赁公司建议塔机基础地基承载力低于塔基基础技术要求中规定耐力

    youdao

  • Unreasonable design project can arose the capsizal of tower crane in building its base on soft soil foundation, and it will also increase the construction cost.

    土地建造塔吊基础,设计方案不合理会引发塔吊倾覆的安全事故,加大项目成本

    youdao

  • Unreasonable design project can arose the capsizal of tower crane in building its base on soft soil foundation, and it will also increase the construction cost.

    土地建造塔吊基础,设计方案不合理会引发塔吊倾覆的安全事故,加大项目成本

    youdao