Shandong tower crane rental company recommended the tower crane foundation shall have no foundation displacement, collapse phenomenon.
山东塔吊租赁公司建议塔机基础不得有位移、地基不得有塌方现象。
A tower crane foundation basement project should take measures in particular: such as piling in foundation, and pile reinforcement and foundation anchor bolts end firmly welded together.
有地下室工程的塔吊基础还要采取特别的处理措施:如在基础下打桩,并将桩端的钢筋与基础地脚螺栓牢固的焊接在一起。
The construction unit when the tower crane foundation, must ensure that the endurance meets the design requirements, the strength of reinforced concrete at least the design value of 80%.
施工单位在做塔吊基础的时候,一定要确保地耐力符合设计要求,钢筋混凝土的强度至少达到设计值的80%。
Independent type of tower crane foundation relatively high investment cost, the utility model has the advantages of small occupied area, select the tower location flexible, good safety and stability.
独立式塔吊基础相对投入费用高,其优点占地小、选择立塔位置灵活、安全稳定性好。
To walk after fixed tower crane should remain on track, such as fixed position in backfill soil, the foundation for special treatment, must meet the load requirements.
先行走后固定塔吊应立于轨道上,如后固定位置处于回填土上时,其基础作特殊处理,必须满足承载要求。
Should not be less than the requirements of the tower base map technology in endurance value of bearing capacity of foundation of tower crane, tower crane rental company recommends 1.
塔吊租赁公司建议塔机基础地基承载力应不低于塔基基础图技术要求中规定的地耐力值。
Unreasonable design project can arose the capsizal of tower crane in building its base on soft soil foundation, and it will also increase the construction cost.
在软土地基中建造塔吊基础,设计方案的不合理会引发塔吊倾覆的安全事故,或加大了项目成本。
Unreasonable design project can arose the capsizal of tower crane in building its base on soft soil foundation, and it will also increase the construction cost.
在软土地基中建造塔吊基础,设计方案的不合理会引发塔吊倾覆的安全事故,或加大了项目成本。