• The water and chemical consumption is reduced so that the total process cost is low.

    撇油和过滤设计使清洗液能长时间循环使用,节约水资源和化学品,降低清洗工序成本。

    youdao

  • Finding design errors early in the development process reduces the total cost of product development.

    在开发过程的早期阶段找到设计上的错误,可以显著地降低产品开发的总体成本。

    youdao

  • Chapter Five is an introduction to the calculation methodology of total cost control, with in-depth discussion of the theories, characteristics and calculation process of total cost accounting.

    第五章:高校科研全成本计算法引入,全面阐述了全成本计算法的原理、特点和计算程序。

    youdao

  • Though the expense of design process occupies 5% of the product total cost, it decides 70%-80% of the product cost.

    产品设计过程所占的费用虽然只占到产品总成本的5%,但是却决定了70%-80%的产品成本。

    youdao

  • It affects the efficiency of each follow-up producing process and the total cost in mining.

    它影响到矿山各后续生产工序的效率和采矿生产总成本。

    youdao

  • The method presented in the paper could provide references for enterprises' environment cost control through cost analysis, total process control based on environment cost affirming and cost account.

    该方法从环境成本的确认、核算入手通过成本分析、全过程控制,为企业进行环境成本控制提供了借鉴。

    youdao

  • Total cost management is a method of cost management orienting the 21st century. At present, it consists of total process, total factor, total risk and total team management.

    全面造价管理是面向21世纪的造价管理方法,目前它是集全过程、全要素、全风险和全团队为一体的造价管理。

    youdao

  • Software maintenance plays an important role in the total process of software development, but its cost is difficult to control.

    软件维护在软件开发过程中占有相当重要的位置,但是其成本往往是很难控制的。

    youdao

  • As a result, the total cost of the remaining job cost sheets in the subsidiary Job Cost Ledger continues to equal the debit balance in the Goods in Process controlling account.

    批次成本分类账中剩下的成本计算单上的成本总额仍与在产品账户的数额相等。

    youdao

  • The total process control of engineering cost management is discussed by three stages of investment decision, design and construction.

    本文结合工程造价管理经验,从投资决策阶段、设计阶段、施工阶段阐述了如何对工程造价进行全过程控制。

    youdao

  • The total process control of engineering cost management is discussed by three stages of investment decision, design and construction.

    本文结合工程造价管理经验,从投资决策阶段、设计阶段、施工阶段阐述了如何对工程造价进行全过程控制。

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定