Making use of the relations among the direct cost, the indirect cost and the total cost, we get the best time limit for the project with results of the optimal T-C decision-making.
利用直接费用、间接费用与总费用的关系,预测出总费用最低时对应的工期,从而给出了工期一费用的最优决策。
Making use of the relations among the direct cost, the indirect cost and the total cost, we get the best time limit for the project with results of the optimal T-C decision-making.
利用直接费用、间接费用与总费用的关系,预测出总费用最低时对应的工期,从而给出了工期一费用的最优决策。
应用推荐