Cement was displaced with pressure indications observed as the top plugs passed through the plug-locator collar and the top wiper plugs bumped on the respective float collars.
随着顶部胶塞通过胶塞定位浮箍达到相应浮箍位置,水泥在压力指示确认下完成顶替过程。
Cement was displaced with pressure indications observed as the top plugs passed through the plug-locator collar and the top wiper plugs bumped on the respective float collars.
随着顶部胶塞通过胶塞定位浮箍达到相应浮箍位置,水泥在压力指示确认下完成顶替过程。
应用推荐