• This contract is a first step to transition to the ship construction contract.

    这份合同船只建造合同过渡一步

    youdao

  • Raytheon, which also is the ship electronics systems integrator for the program, won a prime contract in 2005 to provide life-cycle engineering and support for the LPD 17.

    雷神公司船舶电子系统集成商,曾2005年获得一份合同LPD17提供全寿命周期工程支持

    youdao

  • In registering the mortgage of a ship under construction, the building contract of the ship shall as well be submitted to the ship registration authorities.

    建造中的船舶办理抵押权登记应当船舶登记机关提交船舶建造合同

    youdao

  • The Master of the ship in distress or its owner shall have the authority to conclude a contract for salvage operations on behalf of the owner of the property on board.

    遇险船舶船长或者船舶所有有权代表船上财产所有人订立救助合同

    youdao

  • If you can get a signed version of the contract we've agreed upon back to me by tomorrow morning, we'll go ahead and make arrangements to ship the product on Tuesday.

    明天早上之前可以传给我们一个签过名合同,我们接着一些安排星期二运输产品

    youdao

  • A document of business terms between you (seller looking to ship goods) and the transportation company. It serves as document of title, a contract of carriage, and a receipt for goods.

    作为委托送货卖家运输部门之间签订的货运相关凭证。提单有以下作用:货物所有权凭证承运合同,也可作为货物提取的相关收据

    youdao

  • The Seller shall ship the goods within the time as stipulated in clause 8 of this Contract by a direct vessel sailing from the port of loading to China port.

    卖方合同第8规定时间之内货物装运中国口岸直达船。

    youdao

  • Before being allowed to board a ship in China, however, they had to prove that they were going to their own free will and were under no labor contract.

    然而中国允许上船之前他们必须证明自己自愿走的,不是劳动合同的约束。

    youdao

  • The ship date on the master contract has been changed to "Must be on a vessel on or prior date" and cargo must sail on or before this date.

    合同船舶日期改为必须船舶抵达之日之前”,货物必须指定期限内运出。

    youdao

  • The Seller shall ship the goods within the time as stipulated in Clause 8 of this Contract by a direct vessel sailing from the port of loading to China port.

    卖方合同第8规定时间之内货物装运中国口岸直达船。

    youdao

  • The Seller shall ship the goods within the time as stipulated in Clause 8 of this Contract by a direct vessel sailing from the port of loading to China port.

    卖方合同第8规定时间之内货物装运中国口岸直达船。

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定