This paper introduces an advanced traffic signal controller, which can not only implement multi-time block control, but also can be connected with network in order to realize on-line control.
介绍一种技术性能比较先进的交通信号控制机,这种信号机不仅能够自动地进行多时段控制,还可以接入网络实现在线控制;电路设计采用模块式的电路结构,可根据用户的功能需要增减模块电路。
First, claim a block of time to gain control.
首先,拿出一段时间来实现控制。
Conclusions: To control the intra-operative blood loss and less the operative time, either abdominal aorta block or internal iliac artery ligation is suitable, without serious complications.
结论在骶骨肿瘤切除手术中应用腹主动脉阻断比髂内动脉结扎技术更能有效控制术中失血量,而且并不会增加手术操作难度及延长手术时间。
Process control block may contain the following information: process name, arrival time, you need to run time, CPU time used, process status, and so on.
进程控制块可以包含如下信息:进程名、到达时间、需要运行时间、已用CPU时间、进程状态等等。
Process control block may contain the following information: process, and priority number, the need to run time, has taken the CPU time, the process of the state and so on.
进程控制块可以包含如下信息:进程名、优先数、需要运行的时间、已占用的CPU时间、进程状态等等。
A control block used for communication between the time-sharing driver and the time sharing interface program.
一种控制块,用于分时驱动程序与分时接口程序之间的通信。
Process control block may contain the following information: process, and priority number, the arrival time, the running time, CPU time used, the process of the state and so on.
进程控制块可以包含如下信息:进程名、优先数、到达时间、需要运行时间、已用CPU时间、进程状态等等。
The 8 essential blocks of the linear control system are introduced, and then give the fun ct ion block of their time response.
介绍了线性控制系统的8个典型环节,给出了这些典型环节的时间响应功能块。
Signal changes were observed within contralateral primary motor cortex in subjects of control group. The maximal signal pixel time-signal curve was the same to the movement of BLOCK model.
对照组受检者单侧肢体运动均可在对侧大脑半球初级运动皮质观察到兴奋区,其最大信号像素时间-信号强度曲线与BLOCK模式运动时相一致。
A control block used for communication between the time-sharing driver and the time sharing interface program.
一种处理控制程序和分时驱动程序之间的各种通信的程序。
This article proposes the operating principle and the program block-diagram of the automatic switching control to the main circuit-breaker on board of each powered unit of the train at proper time.
本文介绍了该装置对列车各车组适时进行主断路器自动分合闸控制的工作原理及程序框图。
This article proposes the operating principle and the program block-diagram of the automatic switching control to the main circuit-breaker on board of each powered unit of the train at proper time.
本文介绍了该装置对列车各车组适时进行主断路器自动分合闸控制的工作原理及程序框图。
应用推荐