• In fact, going beyond compliance saves cost at the same time that it generates cash, provided that management adopts the new lean and green model.

    事实上如果管理层采用新的精益绿色管理模式超越合规性可以产生现金同时节约成本

    youdao

  • Lower your development time and cost by taking advantage of the simplified business rules programming model.

    通过利用简化业务规则编程模型,可以减少开发时间成本

    youdao

  • Transaction and HTTP request metering based on CPU time per hour, minute, or second is the most accurate billing and metering model, as each transaction can be measured for total cost.

    基于小时每分钟秒钟CPU时间进行的事务HTTP请求计量准确计费和计量模式因为可以计算成本中每个事务的成本。

    youdao

  • What you gain for that cost in time is a far better understood and more robust programming model.

    时间花费带来的回报理解深刻并且健壮的编程模型。

    youdao

  • In the case of static analysis, most of the information is extracted from the model and used to analyze cost, time management, performance, process flow validity, and resource leveling.

    静态分析中,大多数信息是从模型提取出来用于分析消耗时间管理性能流程有效性资源水平

    youdao

  • The paper, based on the model of "block of time" cost calculator, makes a simple model to accommodate for the library practice of virtual reference services in our country.

    介绍“间隔时间成本预算模型基础,对该模型进行简化使适合中国图书馆虚拟参考咨询服务实践

    youdao

  • Using this advanced model, translation time can be reduced by 25% to 50%, while producing high-quality translation output and up to 30% cost savings, in many cases.

    许多情况下通过使用这种高级机器翻译模式节省25 - 50%的翻译时间,还能保证高品质译文能节省30%的成本

    youdao

  • In this paper, the minimum cost flow problem with fuzzy constraint is proposed for the first time, and the corresponding mathematical model is constructed.

    本文首次提出模糊约束最小费用问题建立相应数学模型并给出了求解这一模型的有关算法。

    youdao

  • An integrated process model is presented, which is based on activities of the process and integrated with the multi views including product structure, organization, resource, cost and time.

    提出了过程活动为核心,集成产品结构组织资源成本时间视图的集成化产品开发过程模型

    youdao

  • The concept of reliability cost is presented, and a model of real time fault tolerant scheduling based on heterogeneous distributed systems given.

    提出可靠性成本概念,建立了基于异构分布式系统实时容错调度模型

    youdao

  • In order to select optimum route, thinking about the factors which are time of transfers, cost of running and times of transfers, a compound evaluation index model is obtained.

    为了选择最优路径,综合考虑出行时间、出行费用换乘次数因素,给出一个综合评价指数模型,并用算例对算法和模型可行性进行验证。

    youdao

  • An optimization model to find the lowest budget schedule of network planning is established under the assumption that the time-cost relationship is nonlinear.

    在时间-费用关系非线性假设建立网络计划最低成本日程优化模型

    youdao

  • In the first model users' generalized travel cost are assumed to be weighted sum of the standard deviation and the mean travel time, and users have perfect knowledge of the road network condition.

    第一模型中,假定出行者广义出行费用定义为平均行程时间行程时间均方差的线性加权和,同时出行者能够正确认识自己的广义出行费用。

    youdao

  • Design of flutter model from aircraft metal structure to composite structure can be achieved by equation of stiffness, yet it may cost much time for general design method.

    金属飞机结构复合材料结构颤振模型设计,要求采用刚度等代法完成然而一般的设计方法通常需要消耗大量时间

    youdao

  • This paper introduces a method, that set up a model of linear programming in networks time cost analysis, and illustrates the application of the method through a example.

    介绍单纯形求解网络最优工期成本方案步骤方法,重点介绍了数学模型建立原理和步骤。

    youdao

  • This part studies two problems: transportation model of delivery stock cost and inventory model for unconfirmed lead time.

    在此基础上重点研究两个问题,即考虑在途库存成本运输模型以及需求与前导时间不确定的存储模型。

    youdao

  • In order to decrease the developing time and developing cost of the thermal power system software based on model calculation, an integrated modular modeling software was discussed.

    为了缩短模型计算软件开发周期、降低开发费用研究编制了一体化模型开发平台

    youdao

  • A stochastic network model is built by use of the theory and method of Monte Carlo Simulation, with a view to analyzing the risk of the time limit for project and its cost.

    建立一个工期费用估计随机网络模型,说明应用蒙特卡洛模拟进行工期和费用风险分析原理方法

    youdao

  • CONWIP integer programming model is built, and its optimization goal is machine setup cost and inventory cost and production flow time. In order to solve this model, the heuristics are provided.

    机床加工准备成本工件库存成本加工流动时间优化目标建立了CONWIP系统整数规划模型,并提出求解问题启发式算法。

    youdao

  • Linhai scrvice independent production, rapid distribution business model, and reduce your purchase cost, save your purchase time.

    林海公司秉乘自主生产快速配送经营模式降低采购成本节约您的采购时间

    youdao

  • The result of this experiment shows that the modified RBF neuro-network increases trend accuracy in sequential predicting, while debasing the cost of time and reducing the complexity of the model.

    试验结果表明,加入聚类分析径向基神经网络模型提高了连续预测趋势准确率降低时间代价减小模型复杂度

    youdao

  • Under a general assumption, we establish directly the optimality equation for infinite time horizon average cost model and prove the existence of optimal solution in a compact action set by using p.

    一般假设条件下我们应用性能势的基本性质直接建立无限时间水平平均代价模型的最方程并且证明紧致上最优存在性 。

    youdao

  • Objective Aim at the influence factors of the mastacarcinoma patients hospitalized costs, the more reasonable cost time series model will be investigated and established.

    目的针对乳腺癌患者住院医疗费用影响因素探讨更为合理费用时序模型,为卫生管理部门和医院制定相关政策提供科学依据。

    youdao

  • The air flow model size is smaller. It possesses the advantage of shorter testing time and lower cost, but the experimental accuracy is lower.

    气流模型具有尺寸试验周期短成本特点试验精度较低。

    youdao

  • The analytic model of business process assignment optimization is presented to undertake the trade-off among resource, time, cost constraints and decision nodes in multi-project environment.

    建立了折衷考虑资源时间成本约束以及决策节点多项目环境下经营过程配置优化解析模型

    youdao

  • A method is proposed to solve time-cost trade-off model for activity networks by using the minimum cost flow principle.

    提出了利用最小费用原理求解时间-费用优化模型方法

    youdao

  • And the model considered the time efficient and operation cost of the applications, it didn't emphasize the domain engineering, the application development is for submission, but it need use CBSD.

    过程模型还考虑应用系统开发时效软件开发团队运营成本问题,此阶段软件复用强调领域工程应用系统开发面向提交的,需要使用基于构件的软件开发。

    youdao

  • Based on cost method of calculating reserves value, this paper puts forward value evaluating model of natural gas reserves (excess income general model) for the first time.

    成本计算储量价值基础上,首次提出天然气的储量价值评估模型(超额收益综合模型)。

    youdao

  • Based on logistics activity-based costing, the paper adds logistics time to logistics cost calculation and built the T-A model of logistics costing.

    物流作业成本法基础上,加进了基于物流时间的物流成本核算方法,构建了物流成本核算的T - A模型

    youdao

  • Based on logistics activity-based costing, the paper adds logistics time to logistics cost calculation and built the T-A model of logistics costing.

    物流作业成本法基础上,加进了基于物流时间的物流成本核算方法,构建了物流成本核算的T - A模型

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定