• The increase or decrease of the discharge, after Three-Gorge Project goes into operation, will change the sand exchange and silt deposition in Poyang Lake.

    三峡工程运行后增减下泄流量,将使鄱阳湖的泥沙交换和淤积作用发生变化。

    youdao

  • With the completion of the Three-gorge Project (TGP), the residence time of the water body will be prolonged, and the eutrophication within TGR will be aggravated.

    随着三峡工程的全面完工,库区内水体滞留时间的进一步延长,三峡库区水体富营养化趋势将会进一步加剧。

    youdao

  • The Three-Gorge project is a big system project over the century, connected with many disciplines. it has tremendous flood prevention benefits many kinds of economic benefit and social benefits.

    三峡工程是一项跨世纪、多学科的巨大系统工程,它具有巨大的防洪效益和多种经济效益及社会效益。

    youdao

  • The analysis of stability and deformation of the third stage core cofferdam of the Three Gorge Project is performed by the uncoupled finite element method.

    利用非耦合的有限单元法分析了三峡工程三期心墙围堰方案中围堰的稳定性和变形情况。

    youdao

  • First, the paper introduces the system design of Integration Command Core (prototype) in the decision support system of Three Gorge Project which is based on Geography Information system.

    本文首先介绍了以地理信息系统为基础的三峡工程决策支持系统集成指挥中心(原型)的系统设计。

    youdao

  • This paper presents a nonlinear Stress-Strain analysis of 2nd stage cofferdam of the Three Gorge Project.

    本文对三峡工程二期围堰进行了非线性应力应变计算。

    youdao

  • This paper presents a nonlinear Stress-Strain analysis of 2nd stage cofferdam of the Three Gorge Project.

    本文对三峡工程二期围堰进行了非线性应力应变计算。

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定