• This paper presents simulating optimal quality cost by using the ratio of reconstruction cost on divided engineering and curve fitting model, and applies the model in a.

    利用分部分项工程返修费率概念,线拟合模型模拟最佳质量成本将其应用于某施工企业质量成本管理工作。

    youdao

  • To achieve the maximum benefit with limited cost in determining the optimal aseismic design level is one of the most typical and practical engineering decision analysis problem.

    如何确定抗震设防标准以便使有限资金发挥最大的抗震效果,就是典型实用价值工程决策问题

    youdao

  • To achieve the maximum benefit with limited cost in determining the optimal aseismic design level is one of the most typical and practical engineering decision analysis problem.

    如何确定抗震设防标准以便使有限资金发挥最大的抗震效果,就是典型实用价值工程决策问题

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定