• Having researched the production schedule of the factory, the mathematical model has been built.

    研究某工厂生产调度问题,建立数学模型

    youdao

  • This paper studies an integral programming model of production schedule in rayon factory, presents the method of solution and application example.

    本文给出人造丝厂生产作业计划整数规划模型求解方法应用实例

    youdao

  • Finally, the problem of the production line is diagnosed by simulation and the model is rebuilt based on schedule optimized scheme, WIP optimized scheme, people optimized scheme.

    最后,针对仿真结果分析生产线中的问题,提出优化方案在制品控制优化方案、人员配置优化方案分别重新建立了生产线物流的模型

    youdao

  • Finally, the problem of the production line is diagnosed by simulation and the model is rebuilt based on schedule optimized scheme, WIP optimized scheme, people optimized scheme.

    最后,针对仿真结果分析生产线中的问题,提出优化方案在制品控制优化方案、人员配置优化方案分别重新建立了生产线物流的模型

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定