Things can quickly get out of control if anyone associated with the project is able to submit new requirements and/or change requests.
如果任何与项目有关的人都能够提交新的需求和/或变更需求,那项目会很快地陷入一片混乱并失去控制。
On the other side, late in the project, you often want to introduce more control, such as change control boards, to remove undesired creativity and associated risk for late introduction of defects.
另一方面,在项目后期,你往往想要引入更多控制,比如变更控制板,来消除不想要的创造性和相关风险,以免在晚期引入缺陷。
The project is narrowly scoped to solve the problem of access control to avoid imposing a large and complex change patch on the mainstream kernel.
这个项目专门用于解决访问控制问题,以避免对主流内核进行大量的复杂修改。
After a change to a database is made, the data design project (including all of the resources that it contains) should be checked into version control and tagged or labeled.
当数据库更改后,Optim Database Administrator项目(包括它所包含的所有资源)应该签入到版本控制中,并被赋予一个标记或标签。
Addressing the social side of software engineering, Scrum's proven process patterns can offer immediate benefit in requirements management, change control, and project management.
至于软件工程的社会效应方面,Scrum已被证实的过程模式可以即时地方便需求管理,变化控制以及项目管理提供。
If you have compiled the project and you get this, the next step is to change the properties of the control.
如果您已经编制了项目,你会得到这一点,下一步就是要改变控件的属性。
Thee project management team uses stakeholders with expert judgment on the change control board to control and approve all requested changes to any aspect of the project.
项目管理团队利用在变更控制委员会具有专家判断的利害关系者,控制与批准项目各个方面的所有变更请求。 。
The change control system is a collection of formal documented procedures that define how project deliverables and documentation are controlled, changed, and approved.
变更控制系统是正式形成文件的过程的全体,用于确定控制、改变和批准项目可交付成果和文件的方式、方法。
Describes the control interface and connection and interface change technology of TV monitor system, in detail and offers a number of means of realization in project applications.
详细描述了电视监控系统中控制接口与连接以及接口转换技术,提供了在工程中的实现方法。
If the control is part of the current solution, when you change from Debug to Release, your project continues to reference the Debug version of the control.
如果控件是当前解决方案的一部分,则当您从“调试”改为“发布”时,项目会继续引用此控件的调试版本。
The technology economic evaluation of construction change plan is the important link of construction project change management in the process of construction project change control.
而建设项目工程变更控制过程中,工程变更方案的技术经济评价是建设项目工程变更控制管理的重要环节。
During the creation of lessons learned for a project, the team determines that the project would have been better if they had a change control board.
在准备项目的经验教训时,团队认为如果当初设立变更控制委员会,项目会更好一些。
The cost control capacity of the project is vulnerable to the change.
工程成本控制应变能力差等;
From the cause of project change, this paper analyses the influences of project change over municipal engineering cost and how to control the project change of municipal engineering well.
从工程变更产生的原因出发,分析了工程变更对市政工程造价的影响,提出了加强市政工程变更有效控制的措施。
Keeping this scope under control requires a formal procedure for approving any change to the original scope of the project;
但是,控制住这个初始范围需要有正式的审批流程——任何对原项目范围的变更都需要审批;
Keeping this scope under control requires a formal procedure for approving any change to the original scope of the project;
但是,控制住这个初始范围需要有正式的审批流程——任何对原项目范围的变更都需要审批;
应用推荐