• You can have more than one developer connected to a Unit Test server where your code is running; the number of users you can connect depends on the capacity of your server.

    运行代码的一个Unit Test同时允许多个开发人员连接可以连接用户数量取决于您的服务器容量

    youdao

  • The client laptop is connected to the mainframe in Texas (this is optional), and also to the Unit Test feature at address 192.168.1.111.

    客户便携式计算机连接到位于德克·萨斯大型机(可选的),连接地址为192.168.1.111的UnitTest特性

    youdao

  • Select the newly created datasource and use the 'Test connection' button to check the database can be connected to correctly, as shown in figure 22.

    选择新建数据源使用Testconnection按钮检查是否可以正确连接数据库如图 22 所示。

    youdao

  • This agent is connected to database TEST (the name of the database has been truncated in the svmon output, only 'TES' is shown).

    这个代理连接数据库test(数据库名称svmon输出已经截断显示了'TES ')。

    youdao

  • They are fully connected and traceable throughout all the lifecycle artifacts, including requirements, test cases, and code.

    整个生命周期的工件中,它们完全连接可追溯的,包括需求测试案例,和代码。

    youdao

  • After selecting the model, select the model-based test case that should be connected to the test script (see Figure 7).

    选择模型之后,您可以选择应该连接测试脚本基于模型的测试用例(见于7)。

    youdao

  • As part of its initial test flight, the solar Impulse's solar panels were not yet connected or used.

    不过在这次试飞过程,飞机没有使用机上太阳能电池板

    youdao

  • For convenience, running the following files in CONNECT_BY.zip when connected to a test database will reproduce all the DB2 SQL in this article.

    为了方便连接一个测试数据库时,运行CONNECT _ BY . zip中的以下文件重新产生本文中的所有DB 2sql

    youdao

  • When you start the shell, you'll see that you are initially connected to the "test" datastore.

    启动shell的时候,您看到您最初与“test”数据存储连接。

    youdao

  • This number includes, therefore, main lines already connected and main lines available for future connection, including those used for the technical operation of the exchange (test Numbers).

    所以这个数字包括连接主线用于将来连接可用主线数,包括交换技术操作主线(测试号码)。

    youdao

  • Scope ground may be connected to other DC level in the circuit other than ground provided the circuit under test is floating.

    如果测试电路浮动的﹐示波器的可以接到除地以外其他直流电平处。

    youdao

  • Seal the blind plate and check carefully whether the pipeline is correctly connected and block phenomenon in the pipe before pressure test.

    试压要先认真检查管路是否连接正确,有无管内堵死现象

    youdao

  • Realizing real-time programmable of signal source by real-time downloading waveform data from the computer that connected test bench by USB bus.

    并且利用USB总线计算机测试台相连可完成波形数据实时下载实现信号源实时可编程

    youdao

  • To test the electrical wiring is connected correct or not, whether the operating switch is flexible or not.

    检查电气接线是否正确连接操纵开关是否动作灵活可靠

    youdao

  • For high frequency, or low amplitude measurement, probe ground shall be connected to appropriate points in the circuit under test.

    对于高频低幅值测量探头接到测试电路中的适当位置。

    youdao

  • Mental test comes to be a new issue in the field of penal evidence and its positioning is closely connected with its fate.

    心理测试是刑事证明领域一个问题,如何定位关系技术的命运

    youdao

  • Can be directly connected to the scanning head of the test needle. Not to replace the probe can be scanned simultaneously and point measurements.

    可以直接连接扫描头上不用进行更换头就可以同时进行扫描测量工作

    youdao

  • You may not probe, scan or test the vulnerability of the Site or any network connected to the Site, nor breach the security or authentication measures on the Site or any network connected to the Site.

    可以探查扫描测试网站连接网站任何网络漏洞也不可以违反网站或连接到网站的任何网络安全性身份验证措施

    youdao

  • The impulse test equipment shall be calibrated by means of a peak detecting electronic voltmeter connected directly between the electrode head and ground.

    脉冲火花机校准把数位电压表直接接在测试电极之间

    youdao

  • Hydraulic control valve and transducer connected to the host computer through a wireless network. The drilling parameter of test equipment could be monitored and controlled automatically by computer.

    并且液压控制阀变频器通过无线网络电脑主机相连,达到无线检测控制钻进参数目的。

    youdao

  • Performance test is the last and the most important working procedure on the alternator's product line. Products' quality and production's efficiency are connected with the level of performance test.

    性能测试发电机出厂前生产线最后一道重要一道工序,性能测试水平的高低直接影响产品质量生产效率

    youdao

  • In the following test cycle the standard leak will be connected through the chamber at that moment where the test sample will be filled with test pressure.

    测试标准泄漏此时接到室,气室内的试件充满了测试压力。测试结束时,结果就显示在屏幕上。

    youdao

  • PSASP applied in the paper, the problems raised by the Shandong high-voltage test hall connected to the grid are discussed, and then the solutions are put forward.

    应用中国电科院的PSASP程序,山东电力研究院高压试验大厅接入电网产生的若干问题进行了计算分析,针对性地提出了解决措施。

    youdao

  • Instruments in the test system are connected with Trigger Link cables, a hard ware handshake bus in newer Keithley instruments.

    测试系统中的仪器通过TriggerLink电缆(较新的Keithley仪器采用的硬件握手总线)进行连接的。

    youdao

  • Based on the geological data of Tahe Oilfield, the well test interpretation model of the reservoir with the fracture and vug which are connected with well-bore is established.

    结合塔河油田实际地质资料建立裂缝溶洞-井筒连通的试解释模型相应的数学模型。

    youdao

  • By use of the GPIB, it can make many test instruments connected with automatic test system.

    运用GPIB通用标准接口总线,可以使测试仪器仪表同时接入计算机自动测试系统。

    youdao

  • The test platform is positioned outside the honeycomb duct, and the element to be tested is positioned inside the honeycomb duct, and electrically connected to the test platform.

    测试平台位于导流,且元件位于导流管内电性连接至测试平台。

    youdao

  • The system then polls the instrument bus to find connected instruments, which includes equipment under test and those instruments used as calibration standards.

    然后系统轮询仪器总线寻找连接仪器包括仪器用作校准标准的那些仪器。

    youdao

  • When the SourceMeter instruments and switch mainframe are connected via trigger Link, they can trigger each other to allow faster test execution.

    开关主机通过TriggerLink连接时,它们能够彼此触发更快地进行测试。

    youdao

  • When the SourceMeter instruments and switch mainframe are connected via trigger Link, they can trigger each other to allow faster test execution.

    开关主机通过TriggerLink连接时,它们能够彼此触发更快地进行测试。

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定