• The switch wire harness must be disconnected before testing switch continuity.

    测试导通性之前必须断开开关线束

    youdao

  • You can thus deploy the same set of scripts from the testing data connection to the production data connection with a simple configuration name switch.

    因此测试数据连接产生数据连接,都可以通过简单配置名称切换部署相同脚本

    youdao

  • It is much easier to switch the target RES if we have a list of RES configuration available for development, testing and production environments.

    如果我们一个RES配置列表用于开发测试生产环境,则可以轻松切换目标RES。

    youdao

  • Switch has been doing its own longevity testing.

    Switch一直在进行自己寿命测试

    youdao

  • Sun has stowed its cloud infrastructure - which it's been testing for a while - at the SuperNAP data center run by Switch Communications in Las Vegas.

    Sun基础设施装载拉斯维加斯switchCommunicationsSuperNAP数据中心,并已经经过了一时间的测试

    youdao

  • Well, for testing purposes, you can just use ipa-test-interpreter switch in compiler Settings and it will run the same way like on the Android or the BlackBerry Tablet OS.

    那么出于测试目的只需使用编译设置的ipa - test -interpreter开关就会运行AndroidBlackBerryTabletOS上的一样。

    youdao

  • You can launch in hosted mode once again, but you'll need to switch over to GWT's Web mode for testing your new page.

    可以再次托管模式启动但是需要再次切换GWTWeb模式测试页面

    youdao

  • Then switch your mental image to the testing room and imagine yourself feeling the same way.

    然后自己头脑中的形象转换考场想象自己有同样感觉

    youdao

  • This means testing the backup and imaging solutions, the stability of installed software and the ability to switch away from RAID without significantly disrupting your existing setup.

    意味着测试备份映像解决方案已安装软件稳定性和不使用RAID不会明显地破坏现有设置能力

    youdao

  • Switch system is the center of automatic testing platform, by which signal can be switched to the port of UUT and the apparatus.

    开关系统整个自动测试平台中心能够各类信号自动切换测对象输入端口相应的测试仪器

    youdao

  • Testing system, in which DSP is the part of core and CPLD is as peripheral circuit, controls operation parts, and test or incept the digital signal, analog signals and switch signals from exterior.

    测试系统采用了以数字信号处理器核心,以复杂可编程逻辑器件外围电路来控制执行部件测试接收外部返回的数字信号模拟信号和开关信号。

    youdao

  • Testing data is received with data acquisition plug, signal from tested circuit board is transferred by circuit of switch relay.

    前端采集插头接收测试数据切换继电器电路传递电路板信号

    youdao

  • Comparing collection connection signal of testing post with right interlinkage state, we estimate the assembled switch check out whether or not, to complete middle control about auto assembled switch.

    通过采集测试连接信号正确互连状态进行比较,从而判断组合开关是否合格,完成汽车组合开关的中间监控

    youdao

  • Model 7020 Digital I/O Interface Card is employed to switch the digital signals used to set the phone to various operating modes during testing.

    利用一块7020数字I/O接口卡切换测试期间用以电话设置各种工作模式数字信号

    youdao

  • Given that continuity testing often involves multi-conductor devices, a switch sys tem is useful to connect the ohmmeter to each conductor automatically.

    既然通断性测试往往涉及到导线装置,因此利用开关系统欧姆表自动连接导线非常有用。

    youdao

  • Testing the pressure switch and it's simulative display.

    测试力敏开关力敏开关模拟显示

    youdao

  • Ultrasonic imaging nondestructive testing technology could be used effectively in inspecting and controlling braze quality of switch electric contact.

    针对开关触头质量难以检测问题,采用超声成像无损检测技术能够有效地检测控制焊接质量。

    youdao

  • The testing system was mainly composed of PLC, MMI, frequency converter, approach switch and acceleration transducer.

    并通过PLCMI开关速度传感器组成控制系统完成对零部件的振动试验

    youdao

  • The testing device is composed of many switch components and at least a short-circuit bar.

    测试装置多个开关组件至少短路所构成

    youdao

  • As an important component of software testing, Integration test occupies a pivotal position in the development process of Soft-Switch System.

    作为软件测试中的一个重要组成部分集成测试软交换系统开发过程占有举足轻重地位

    youdao

  • The photoelectric switch of safety grating and testing module around the equipment improves the safety of the staff and reduces the failure rate of the equipment.

    设备周围采用安全光栅检测组件光电开关提高了员工安全性减少了设备的故障率

    youdao

  • When these switch components are composed of a thin film transistor, the testing device at least includes a switch wiring coupled to the gates of the thin film transistor.

    开关组件薄膜晶体管所构成时,测试装置包括至少开关配线电性耦接至薄膜晶体管极。

    youdao

  • For example, testing four-wire resistors may require four switch poles per resistor.

    例如测试4线电阻器时,则每个电阻器可能需要4个开关闸刀

    youdao

  • Various kinds of switch volume can be adjusted according the standard of the panel manual operation combination and normal status and single trouble status testing.

    各种开关组合标准由面板手动操作组合正常状态单一故障状态的测试。

    youdao

  • Aimed at the requirements of the low power consumption for memorizing and testing technology, miniature pulse-powered electro-optical invert switch was developed.

    针对存储测试技术对测试系统功耗要求研制了微型脉冲供电式光电倒置开关

    youdao

  • Our company has implemented ISO9001 management mode and obtain the relevant certificate, all high-end precision switch products have been made SGS environmental testing.

    公司实施ISO 9001管理模式并且取得相关证书所有高端精密开关产品SGS环保检测

    youdao

  • Be sure to switch it back once you're done if this impacts your broader testing needs.

    如果这样做会影响大量测试需求完成之后即切换回去

    youdao

  • This article introduces working principle and features of electronic switch machine, and gives the hardware and software composition of the testing system.

    介绍试验台检测系统工作原理性能特点给出检测系统硬件软件构成

    youdao

  • The products are well used at switch mode power, computer , family wiring, communication, medical treatment, office automation and testing facilities.

    产品用于开关电源计算机家用电器通讯设备医疗设备、办公自动化设备、测试设备等。

    youdao

  • The products are well used at switch mode power, computer , family wiring, communication, medical treatment, office automation and testing facilities.

    产品用于开关电源计算机家用电器通讯设备医疗设备、办公自动化设备、测试设备等。

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定