Locking test between the main switchboard and emergency switchboard.
主配电板与应急配电板自检联锁试验。
High pressure switchboard transmission test shall be carried out after electrical element and individual cabinet commissioning.
高压开关柜的传动试验在各电气元件及单体柜调试后进行。
High pressure switchboard transmission test shall be carried out after electrical element and individual cabinet commissioning.
高压开关柜的传动试验在各电气元件及单体柜调试后进行。
应用推荐