• The calculated results from the model were very conformable to the actual statistic results of the stope and were used to modify the blasting design of the test stope, with a satisfactory result.

    模型计算结果采场实际统计结果十分吻合,利用模型计算结果对试验采场的爆破设计进行改进,得到令人满意的实际效果。

    youdao

  • A test calculation of the stope slope in Shenfu Dongsheng and Jungar coal fields by using this method gives a more safety reserve of the slope .

    方法神府-东胜准格尔煤田采场斜坡验算,得知两煤田采场斜坡还有较大的安全储备

    youdao

  • The technology and practice of artifical pumpcrete pillar support is briefly introduced in this paper. The mining test was carried out using the pillars, at 2364 stope of Woxi mining district.

    介绍了泵送混凝土人工支护工艺,并对该工艺进行了一系列可操作性试验湘西金矿沃溪矿区2364采场进行了采矿试验。

    youdao

  • The significance of ditching ratio per ten thousand ton ores for open pits is given, and how to use this index to test productive capacity of stope is briefly discussed.

    露天矿矿石的含义,如何利用指标采场生产能力进行检验,作了简要论述

    youdao

  • Its test results have shown an improved ventilation, controlled stope self combustion and less ground pressure activity.

    实验结果表明方法通风效果改善采场自燃得到控制,地压活动减少

    youdao

  • Its test results have shown an improved ventilation, controlled stope self combustion and less ground pressure activity.

    实验结果表明方法通风效果改善采场自燃得到控制,地压活动减少

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定