The fixed-point and the non - fixed-point buildup test at full development of oilfield can't accurate test stability flowing pressure that results in deviation.
油田进入大面积开发后,进行的定点和非定点压力恢复测试中,存在着由于无法准确的测试稳定流压,造成解释结果偏差问题。
The fixed-point and the non - fixed-point buildup test at full development of oilfield can't accurate test stability flowing pressure that results in deviation.
油田进入大面积开发后,进行的定点和非定点压力恢复测试中,存在着由于无法准确的测试稳定流压,造成解释结果偏差问题。
应用推荐