This paper describes the classification of the pile, the importance of test pile.
介绍了桩的分类,试桩的重要性。
And electrode, test pile than to wait for ten varieties hundreds of specifications.
参比电极、测试桩等十几个品种上百种规格。
Then, design institute edits technology specification of main auxiliary equipment, drawing for site test pile and requirements for test pile.
之后设计院编写主要辅机设备的技术规范书及现场试桩所需的试验桩图纸及试桩要求。
A comparative analysis is made on test pile data from two kinds of similar pile foundations by using the method of connection number in set pair analysis.
运用集对分析中的联系数的方法,对两种类似桩基的试桩资料进行对比分析。
Divided according to material: steel test piles, test piles of cement, plastic test pile. Test piles are divided into carbon steel test piles and steel test piles.
按材质分:钢质测试桩、水泥测试桩、塑料测试桩。钢质测试桩又分为碳钢测试桩和不锈钢测试桩。
Finally, the construction of the construction of the test pile, in the geological supervision of the engineering and technical personnel after the construction of qualified.
最后进行施工结构打点试桩,在经过地质监理工程技术人员的检验合格后方可施工。
On the basis of a lot of test pile data, the article analyzes the pile-soil response mechanism and discusses the influence factors of single pile under the lateral reciprocating loading.
该文在大量试桩数据的基础上,分析了水平往复荷载作用下桩土作用机理,讨论了水平往复荷载作用下单桩的影响因素。
The contents concerned in the paper include: the schematic design of foundation treatment, the test pile and test consolidation, the construction and monitoring of foundation treatment etc.
文中涉及的内容有地基处理方案设计、试桩和试夯、地基处理施工和检测等。
Combined with practical work the construction technology of post-grouting bored pile is introduced and discussed from test pile, construction procedure, pile foundation test and other aspects.
介绍了后压浆钻孔灌注桩的施工工艺,结合工程实例,从试桩、成桩工艺、桩基检测等方面进行了论述,指出后压浆钻孔灌注桩工艺具有承载力高、工程造价低的特。
To test the theory, the scientists recreated what ancient tool makers might have done by heating a pile of silcrete stone in a fire pit.
为了检验这个理论,科学家们通过在一个火坑里加热砾岩石,重现了远古工匠们可能的做法。
My question is, do unit test projects run under the VS process and if so, do these loaded assemblies pile up?
我的问题是,做单元测试项目运行在与过程,如果是这样的话,做这些加载的程序集堆起来呢?
Low strain dynamic nondestructive testing is a new technology to test bearing capacity and quality of pile.
低应变动态无损检测法是检测桩基承载力和桩身质量的一项新技术。
The compression of the pile in the pile group can be determined by static load test. The settlement of the pile toe is calculated by layer wise summation method.
群桩中桩身压缩由单桩静载试验得到的桩顶沉降与桩端沉降之差求得,群桩的桩端沉降由分层总和法计算。
In this article, the author analyzes the causes of abnormal static load test of pipe pile in soft soil stratum, puts forward reasonable advices from design and construction aspect.
对软土地质条件下管桩静载荷试验异常原因进行研究分析,从设计和施工角度提出了合理建议。
All data for completion and acceptance of project shall be complete without loss, especially for pile-made data as quality guarantee of materials, acceptance certificate and test report.
对于竣工验收必备的所有资料必须准备齐全,不得遗漏,特别是制桩资料,如各类材料的质保书、出厂合格证与检测报告等。
In this paper, the authors deal with the basic principle for nondestructive test of the pile inclination.
阐述了基桩倾斜无损检测基本原理——惠更斯-菲涅尔原理。
The basic principle of simple high strain pile test method transformed from measured free fall of drop hammer is given in this paper.
给出测量自由落锤的加速度换算高应变试桩的动力的简易法的基本原理、测试操作与工程应用。
The method of dynamical measurement which was applied to analysis of pile driving is extended to test and measurement on the stiffness and strength of vertical joints between diaphragm walls.
将用于桩基检测的动测法,推广应用于地下连续墙纵向接缝刚性和强度的测试。
How to determine axial bearing capacity of single pile, according to data of pile load test researched the ultimate load, is a very actual problem.
如何根据没有达到极限荷载的试桩资料确定单桩轴向承载力是一个很现实的问题。
It is very important for engineer to determine the uplift ultimate bearing capacity by using the data of non-destructive test of pile.
如何利用现场抗拔静载试验中未达到破坏的工程试桩数据来确定其抗拔极限承载力是一个重要的工程问题。
Based on the in-situ testing of rock-socked pile embedded with test components, the characteristics of the point resistance and skin resistance are studied in this paper.
本文基于埋设有测试元件的嵌岩桩原位试验,分析了在桩顶荷载作用下,嵌岩桩的桩侧阻力、桩端阻力的特征。
The self-Balanced method is a new technologies of foundation pile static load test, vertical compression pile is closer to the actual working conditions of a test method.
自平衡试桩法是一种基桩静载试验新技术,是接近于竖向抗压桩实际工作条件的一种试验方法。
Since few static tests are carried out to determine the capacity of large - diameter concrete pipe pile, dynamic pile test method is widely used to determine its bearing capacity.
在缺少大直径混凝土管桩静载试验的情况下,现在普遍采用了动测试桩的方法确定大管桩承载力。
This paper introduces the test results and calculative method by using the composite foundation of sand-stone pile and concrete pile with low strength.
本文通过试验与工程实践,介绍采用碎(砂)石桩及低强度混凝土桩组合构成复合地基的试验成果、计算方法及应用检测成果。
It also analyses the influence of attenuation of stress wave cased by the soil resistance and the damp of pile shaft material in dynamic pile test on the precision of pile shaft integrity test.
分析了动力试桩中,因土阻力和桩身材料阻尼引起的应力波衰减作用对桩身的完整性检测精度的影响。
This paper illustrates principle of the peculiarity of signal test based on wavelet analysis, and extracts the peculiarity of signal test in pile foundation.
本文阐述了利用小波分析来检测信号的奇异特征的原理,并对桩基础检测信号的奇异性进行了提取。
The O-cell pile testing (OPT) method is a new axial static load test of pile.
自平衡试桩是一种新的静荷载试桩方法。
Now theory about the qualitative analysis of pile test has come to maturity, however, little progress has been made on the quantitative analysis due to many factors.
目前定性评价基桩缺陷的理论已很成熟,而定量分析由于受到影响因素很多,进展缓慢。
The test results indicate an extensive application prospect for super-long pile load test.
试验结果表明该法在超长桩静载试验中具有一定的应用前景。
With more and more high-rise constructions have been builded, the static load test of pile is adopted as the foremost way to identify vertical ultimate bearing capacity of single pile.
随着高层及超高层建筑的涌现,桩基静载试验作为确定单桩极限承载力最可靠的方法已被广泛采用。
应用推荐