Introduced a new implementing method for loading cutting part with high power of shearer, and expound working theory of loading test, main components and main technical feature.
介绍了采煤机大功率截割部加载试验的一种新的实现方法,同时阐述了加载试验的工作原理、主要组成部分和主要技术特点。
Aim to the problem of cutting part with shearer at the mechanical repair workshop, the loading test bed for shearer cutting part undergoing maintenance is manufactured.
针对矿修车间的采煤机截割部的加载问题,研制开发面向维修的采煤机截割部加载试验台,对维修后的采煤机截割部进行加载试验。
Introduced a new implementing method for loading cutting part with high power of shearer, and expound working theory of loading test, main components and main technical feature.
介绍采煤机牵引部直流电力回馈加载试验台的组成、工作原理及特点,加载方法和控制,测试数据的采集、输出及显示。
Introduced a new implementing method for loading cutting part with high power of shearer, and expound working theory of loading test, main components and main technical feature.
本文描述了针对高速运动机构的加载试验系统,介绍了不同的加载方式的特点,描述了采用气动加载的原理,误差分析以及最终实现的系统。
Introduced a new implementing method for loading cutting part with high power of shearer, and expound working theory of loading test, main components and main technical feature.
本文描述了针对高速运动机构的加载试验系统,介绍了不同的加载方式的特点,描述了采用气动加载的原理,误差分析以及最终实现的系统。
应用推荐