• After replaced No. 2 ATC transceiver, test OK.

    更换2号ATC收发机测试正常

    youdao

  • Clean equipment cooling supply air low flow sensor plug, test OK.

    清洗设备冷却供气流量传感器及插头测试正常

    youdao

  • Refer NRC, exchanged APU oil QTY sensor with A/C B-5041, test OK.

    根据非例行工卡,将APU传感器B-5041飞机对串,测试正常。

    youdao

  • Replaced R engine bleed air regulator, running-up test OK, pressure same.

    更换引气调节器试车正常,左右压力一致

    youdao

  • My production user database will be OK; it only impacts my test database, right?

    生产用户数据库没有问题,仅仅影响我的测试数据库,不是么?

    youdao

  • Click OK and save your test plan.

    点击OK保存测试计划

    youdao

  • Select the test case that you want to run, change the computer name to the name of the client machine (see Figure 23), and click OK.

    选择运行测试用例电脑更改客户端机器名字(见于23),点击OK

    youdao

  • Specify the account ID and password you'll use to test, then click OK.

    指定用于测试帐户ID密码然后单击ok

    youdao

  • Well, let's try it. Let's try a little test. OK?

    不过我们还是来试试,做测试怎么样?

    youdao

  • Paste the XML from the clipboard into the test message field, being careful to remove any unnecessary Spaces from the test message, then click OK.

    剪贴板中的XML粘贴测试消息字段,并小心删除测试消息中任何不必要空格然后单击ok

    youdao

  • Type TP1 as the name of the test plan, and click OK.

    输入TP1作为测试规划名字点击OK

    youdao

  • Nor could we test that the new hardware was functioning OK, well in advance, before activating the LPARs and running production workload.

    我们无法启用LPAR运行生产工作负载之前测试硬件是否正常。

    youdao

  • Once the test is successful, click the OK button to save the configuration in the repository.

    一旦测试成功单击OK按钮存储库中保存配置

    youdao

  • So we'll see that, ok, we passed the first smoke test.

    所以我们看到,我们通过第一个发烟测试。

    youdao

  • Choose 'OK' to finish the connection test.

    点击'OK '完成连接测试

    youdao

  • M: Ok, now go hit the sack, but after tomorrow's test we will have to study seriously for next week's test, no more goofing off.

    明天考试你想好好学习星期的考试作准备。没问题,我帮你准备我们俩都会考很好。

    youdao

  • Select the functional test script name, S1, which you need to associate with the TC1 test case, and click OK.

    选择功能性测试脚本S1需要TC1测试用相联系,点击OK

    youdao

  • What I've just said here won't come up on the test on Thursday. OK.

    刚才这些星期四考试会考的。

    youdao

  • Notice the test coverage is bad right now (0%), but that is OK, because it is only one requirement at this point.

    注意测试部分现在糟糕的,但是无妨因为这点唯一一个需求

    youdao

  • So if we simply said, "OK, there's a standard out there called SOAPMicrosoft has their implementation; we have our implementation," guess who people are going to test interoperability with?

    所以如果我们直接:“好吧一个名叫SOAP标准Microsoft他们的实现;我们我们的实现”,猜猜人们的实现测试互操作性

    youdao

  • Run the Apache configuration test and look for a Syntax OK result to make sure everything is in order.

    运行Apache配置测试查看并寻找SyntaxOK结果确保步操作都正常进行

    youdao

  • Start Rational Performance Tester, and click OK in the default workspace location to store the test projects (see Figure 9).

    启动RationalPerformance Tester ,点击OK测试项目保存默认工作空间位置上如图9中所示。

    youdao

  • Click OK to allow the tool to add Tomahawk into the test project (notice that the button tag was also added into the page).

    点击OK允许工具添加tomahawk测试项目中(注意按钮标签添加至页面)。

    youdao

  • If the test connection works, click ok.

    如果测试连接工作单击ok

    youdao

  • If the first one is true, the test is skipped; otherwise, the second and third arguments are passed to ok just as documented above.

    如果第一跳过测试否则,按以上文档述将第二个第三个自变量传递ok

    youdao

  • When you are finished, click OK to list the new test script in the test Scripts section (Figure 22).

    完成时点击okTestScripts列出新的测试脚本(22)。

    youdao

  • Each line after that contains either "ok" or "not ok" depending on whether the test succeeded or failed.

    其后包含oknot ok”,这取决于测试成功还是失败

    youdao

  • OK, so tomorrow we are going to review for the test, so I'm going to tell you a bit more about this also as we go over one practice problem on that.

    明天我们为了小考复习一下,关于这个东西我会告诉更多一点,关于这个我们会复习一下练习题

    youdao

  • Test the output file's correctness by playing it back. If it sounds OK, it's fine.

    播放输出文件检测是否正确,如果效果良好,说明转换没有发生错误。

    youdao

  • Now, we just wait until the confirm dialog exists and tell the handler which button we want to click. For this test, we'll click OK.

    现在我们只是等待直到确认对话框,告诉存在处理按钮,我们点击这个测试中,我们单击确定

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定