• Test instrument point: Have fixed exactly installation position of ventilation and performance test including related drawings.

    试验测点完成通风试验性能试验测点安装位置加工图纸

    youdao

  • The position of the float on the riser should be fixed through calculation and site test and adjusted when necessary.

    浮漂在升降管位置确定通过计算然后现场试验,不断调整。

    youdao

  • The project position of welder qualification test for long transporting pipe depends on vertical down welding basically, which is namely fixed pipe with axis horizontal welding (5gx).

    管道焊工考试项目位置基本向下为主,水平固定全位置焊(5gx)。

    youdao

  • The project position of welder qualification test for long transporting pipe depends on vertical down welding basically, which is namely fixed pipe with axis horizontal welding (5gx).

    管道焊工考试项目位置基本向下为主,水平固定全位置焊(5gx)。

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定