• You should use the test button each month to see if the alarm and batteries are still working.

    应该每月使用测试按钮看看闹钟电池是否在运转

    youdao

  • You will now connect the test button.

    现在连接测试按钮

    youdao

  • In the Test window, click the Run Test button.

    Test窗口中请单击Run Test按钮

    youdao

  • Select the Test button in the OneView component window.

    OneView组件窗口中选择test按钮

    youdao

  • To test the application in the main screen, click the test button.

    屏幕测试应用程序请单击test按钮

    youdao

  • Have suspended test button, can stay in a certain way makes current test.

    暂停测试按钮停留一路进行电流测试。

    youdao

  • Test button: used for testing the application in "unplugged" mode (UIButton class).

    Test按钮用于为插接模式下测试应用程序(uibutton)。

    youdao

  • Use the Test button to verify that a connection can be made to the DB2 UDB SAMPLE database.

    使用Test按钮验证可以建立一个DB 2UDBSAMPLE数据库连接

    youdao

  • Electronic automatic condensation drain with push to test button on prefilter and separator.

    推动电子测试过滤器分离器按钮自动冷凝水去。

    youdao

  • A new query test button enables you to test your query right from the editor, without having to first deploy the project.

    一个新的查询测试按钮允许直接编辑中测试查询,不必首先部署项目。

    youdao

  • You can learn the card reader is normal by operating the card reader self-test button or using the test card to verify.

    先行操作设备本身之自我测试功能检查读卡设备是否正常使用测试卡测试。

    youdao

  • Click on the test button to test the connection to the database and also to confirm the correctness of the Host Access configuration.

    单击test按钮测试数据库连接确认HostAccess配置正确性

    youdao

  • Before you close this dialog, make sure to click on the Test button to verify that you've entered the correct information to connect to and use the IBM DB2 UDB SAMPLE database.

    关闭对话框之前务必单击test按钮验证连接使用IBMDB 2UDB SAMPLE数据库输入正确信息

    youdao

  • Before you close this dialog, make sure you click on the Test button to verify that you've entered the correct information to connect to and use the IBM DB2 UDB SAMPLE database.

    关闭对话框之前单击test按钮检验是否输入连接使用IBMDB 2UDB SAMPLE数据库所需正确信息

    youdao

  • You can use the Test button (with the checkmark) to verify the connection, as shown in Figure 3 (note that this will still give you the login prompt dialog if the password doesn't match).

    可以使用Test按钮(已勾选)检验连接如图3所示(注意如果口令匹配,有login提示符对话框弹出)。

    youdao

  • But as aforementioned, we were unable to test the button ourselves.

    但是正如上面提到的,我们无法亲自测试这一按钮

    youdao

  • I grabbed the test and then pushed the call button.

    抓起孕检测试然后了按呼叫按钮。

    youdao

  • Notice that the test automation simulates a button click by directly invoking the button control's associated method rather than by firing an event.

    注意测试自动化通过直接调用按钮控件相关方法模拟按钮单击的,不是通过触发事件模拟。

    youdao

  • Enter values for the event you want to test and select the event's radio button.

    希望测试事件输入选择事件单选按钮

    youdao

  • Before the actual test even begins (by which I mean bringing up the page and clicking on the button), the test has to first complete several expensive steps.

    开始实际测试(比如打开页面单击按钮)之前,测试必须完成一些步骤。

    youdao

  • Use any (non-null) value for user ID and password, and click the Test Connection button.

    使用任意非空作为用户ID密码单击TestConnection按钮

    youdao

  • A Test Connection button is provided that attempts to communicate with the OmniFind server using the Settings provided.

    表单提供一个TestConnection按钮用来使用提供设置omnifind服务器通信。

    youdao

  • Select the newly created datasource and use the 'Test connection' button to check the database can be connected to correctly, as shown in figure 22.

    选择新建数据源使用Testconnection按钮检查是否可以正确连接数据库如图 22 所示。

    youdao

  • It is always a good idea to press the Test Connection button on the Settings form to verify that the Settings are correct.

    设置表单点击TestConnection按钮检验设置是否正确一个主意

    youdao

  • For example, Figure 10 shows the query result of "Employee by position-department" by using the "Test Sample" button when no filter was set for this query Subject.

    例如10显示没有这个Query Subject设置过滤器使用TestSample按钮进行Employee byposition - department”查询结果

    youdao

  • Click on the Test connections button to see if the Deployment Wizard can connect to the target machine.

    单击testconnections按钮查看DeploymentWizard是否能够连接目标计算机

    youdao

  • Verify the connection by entering the required connection parameters and clicking the Test Connection button as shown in Figure 2.

    输入所需连接参数单击TestConnection按钮验证连接,如图 2 所示。

    youdao

  • We can now run our test by clicking the Play button.

    我们可以点击Play按钮运行我们测试

    youdao

  • Click the Test Connection button to proceed to the next page.

    单击testConnection按钮前进下一页。

    youdao

  • Click the Test Connection button to proceed to the next page.

    单击testConnection按钮前进下一页。

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定