DSPC requires the Long Term Contractor provide DSPC required PPE by themselves, as written in their contract.
根据合同规定苏州杜邦将要求此类承包商自行解决其个人防护用品。
Short term Contractor - Contractor who has signed the short term contract with DSPC, and will be outside DSPC after fulfilling the job.
短期承包商- - -承包商与苏州杜邦签有短期工作合同,当合同所规定的工作结束后承包商将离开公司。
Long term Contractor — Contractor who has signed the Long term contract with DSPC, and will continue to do the job on a regular basis until the termination of contract.
长期承包商- - -承包商与苏州杜邦签有长期合同,此类承包商将长年累月在公司工作直至合同取消。
DSPC responsible areas will handle the required PPE for the short term contractor and assist to smooth other required safety materials 'process such as purchase, borrow and compensation.
苏州杜邦相关区域将负责短期承包商个人防护用品及其他安全用品的购买,借领,赔偿。
In case a contractor deceases during the term of a contract, the successor of the deceased contractor may continue the contract.
承包人在承包期内死亡的,该承包人的继承人可以继续承包。
Long term requirement for a full time mud engineer will be mutually agreed between CONTRACTOR and COMPANY after sufficient experience is gained.
对全职泥浆工程师的长期要求,在取得充分的经验后,由承包商和公司一致同意。
Long term requirement for a full time mud engineer will be mutually agreed between CONTRACTOR and COMPANY after sufficient experience is gained.
对全职泥浆工程师的长期要求,在取得充分的经验后,由承包商和公司一致同意。
应用推荐