• Floor late poured bands apply the technical measures of indwelling catchpit, setting temporary waterproof board and adopting fast easy setback grid instead of formwork.

    底板后浇采用留置集水坑设置临时防水采用收口代替模板技术措施

    youdao

  • Temporary structures are set up to support the formwork when a large concrete bridge with box-section is built.

    采用箱型截面的大型混凝土桥梁,其结构施工过程中浇注混凝土需要设置临时支撑结构。

    youdao

  • Temporary structures are set up to support the formwork when a large concrete bridge with box-section is built.

    采用箱型截面的大型混凝土桥梁,其结构施工过程中浇注混凝土需要设置临时支撑结构。

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定